Similar Projects
Les Lacs Pond Improvements - Town of Addison
Infrastructure
Conception
$2,546,008 CJ est. value
Addison, TX 75001

Demolition / Removal of a Metal Water Storage Tank
Demolition, Infrastructure
Design
$60,000 CJ est. value
Evant, TX 76525

2023 Building Demolition Project
Demolition, Infrastructure
Sub-Bidding
$80,000 CJ est. value
Desoto, TX 75115

Carousel/Secondary Roadways Signage Program
Infrastructure
Sub-Bidding
$3,725,540 CJ est. value
Dallas, TX 75201

Asbestos Abatement Contractor
Alteration
Post-Bid
Bryan, TX

Environmental Services
Term Contract
Post-Bid
Fort Worth, TX

Dangerous Premises Abatement Lot Clearing and Securing of Structures
Results
$436,594 est. value
San Antonio, TX

Mold Remediation Consultant for the MB Envelope Repair and Restoration
Alteration
Results
$3,243 est. value
San Antonio, TX

Hickory Slough Sportsplex Detention Pond Phase 2 - DR2301 - City of Pearland
Infrastructure
Pending Verification
$3,140,000 CJ est. value
Pearland, TX 77584

3 Residential Structures - Demolition
Demolition, Infrastructure
Pending Verification
$18,700 CJ est. value
Temple, TX 76501

Natural Gas Field Inspection Services
Term Contract
Sub-Bidding
San Antonio, TX 78205

Provide Homeless Encampment Cleanup and Abatement Services
Term Contract
Post-Bid
Houston, TX

Haz Mat Removal and Demolition of Golf Course Pro Shop
Infrastructure, Alteration
Results
$82,000 est. value
Burnet, TX 78611

Beltway 8 Mixed Use District
New Construction, Infrastructure
Pending Verification
$350,000,000 CJ est. value
Pearland, TX 77581

Pecan Square Phase 3B Improvements for Clearing and Mass Grading
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Northlake, TX 76247

Last Updated 01/31/2023 06:07 PM
Project Title

Demolition of Various Properties

Physical Address View project details and contacts
City, State (County) Celina, TX 75009   (Collin County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $24,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All debris resulting from demolition / cleanup operations shall be removed as it accumulates and shall not be allowed to be stored on site. Debris shall not be burned on the site.Demolition / clean up shall be conducted in a safe and workmanlike manner in accordance with all Federal, State, and local Laws.All surplus materials removed shall become the property of the contractor and shall be removed from the premises unless otherwise agreed. Entire lot shall be left in a mowable condition and have positive drainage that does not create pooling water. Additional dirt may be required to ensure positive drainage after foundations are removed. Question Deadline 01/10/2023 at 12:00 PM CT celinaebid@customer.ionwave.net

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents