Similar Projects
Norton Creek Flood Control - 603-60-22524 - City of Fridley
Infrastructure
Conception
$900,000 CJ est. value
Fridley, MN 55432

Anoka Metro Regional Treatment Center Miller Building Upgrade
Build-out, Renovation, Infrastructure
Conception
$6,600,000 CJ est. value
Anoka, MN 55303

Sola Riverdale
New Construction, Infrastructure - 12,296 SF
Design
$3,000,000 CJ est. value
Coon Rapids, MN 55448

Lil Explorers Childcare Center
New Construction, Infrastructure - 16,299 SF
Design
$3,300,000 CJ est. value
Ramsey, MN 55303

Kellys Sample Pool Project
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Anoka, MN 55303

Grading, Bituminous Mill and Overlay, ADA Improvements and Lighting
Infrastructure
Bidding
$2,100,000 CJ est. value
Waubun, MN 56589

DNR R2 McGrath Power Shovel Excavation
Infrastructure
Post-Bid
McGrath, MN 56350

Site Preparation
Term Contract
Post-Bid
Bemidji, MN

City Owned Hangar Civil Sitework
Infrastructure
Results
Detroit Lakes, MN 56501

Siwek Park Improvements
Renovation, Infrastructure
Results
$375,000 est. value
Saint Francis, MN

Andover High School Storage Garage Addition
Addition, Renovation, Infrastructure
Construction
$197,440 CJ est. value
Andover, MN 55304

Radisson Hills
New Construction, Infrastructure
Construction
$18,000,000 CJ est. value
Blaine, MN 55449

Riverdale Commons Seventh Addition / Golden Corral Redevelopment
Demolition, New Construction, Infrastructure - 8,900 SF
Pending Verification
$2,800,000 CJ est. value
Minneapolis, MN 55448

Sanctuary Lofts
New Construction, Infrastructure, Build-out
Pending Verification
$6,600,000 CJ est. value
Minneapolis, MN 55417

Rural Reserve Trunk Sanitary Sewer - 24-48200-01 - City of Andover
Renovation, Infrastructure
Conception
$3,800,000 CJ est. value
Andover, MN 55304

Last Updated 02/14/2023 02:06 AM
Project Title

Industrial Park Expansion - 20-ED-01 - City of East Grand Forks

Physical Address View project details and contacts
City, State (County) East Grand Forks, MN 56721   (Polk County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Industrial park Expansion As of February 14, 2023, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents