Similar Projects
Asphalt Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Concrete Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Parks Hall Selective Emsc Replacement
Renovation
Bidding
$475,000 CJ est. value
Everett, WA 98201

Concrete Burial Liners
Term Contract
Sub-Bidding
Bellingham, WA 98229

Precast Concrete Products - Value Blanket
Alteration
Post-Bid
Spokane, WA

Trees and Concrete Upgrade
Alteration
Post-Bid
$285,000 est. value
Clarkston, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Kelsey Creek Picnic Shelter Paving
Infrastructure
Results
$15,000 est. value
Bellevue, WA 98005

Rebid Green Lake Community Boathouse
Demolition, Renovation, Infrastructure
Construction
$8,367,000 CJ est. value
Seattle, WA 98103

DR0515 Repair Fairway 15
Term Contract
Design
$5,000,000 est. value
WA

Russell Creek Project
Alteration
Post-Bid
WA

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

Gustaves Manor Envelope Upgrade
Renovation
Design
$3,446,000 CJ est. value
Auburn, WA 98002

Main Canal Polyurea
Alteration
Post-Bid
Ephrata, WA 98823

Concrete Pavement Repair Project
Infrastructure
Results
Washougal, WA 98671

Last Updated 01/06/2023 03:22 PM
Project Title

Vancouver Center Parking Garage Repairs (Lot 18 Park n' Go)

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98660   (Clark County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $15,624 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 6 2023, the project has not been awarded. A timeline for award has not been confirmed. Repair the cracks on the ceiling of parking level P2 and the concrete spalling above and below the slab separating parking level P2 & P3, along the south wall within the parking structure at the Vancouver Center Parking Garage (also known as Lot 18 Park 'n Go), located mid-block of W 6th St, between Columbia St and Washington St in downtown Vancouver. Questions Due Date: Aug 30th 2022, 3:00 PM PDT Via online portal. Engineer's Estimate Range: $65,000 - $100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents