Similar Projects
Hanger Fans
Term Contract
Post-Bid

Replacement of 120 VRLA batteries in 3 separate battery cabinets and system capacitors for a Liebert UPS model number 38BP120XRX1BNS
Term Contract
Post-Bid

Wood Distribution Pole Bid
Alteration
Post-Bid
Raleigh, NC

Hillside High School - Theater Lighting Replacement Project
Post-Bid
Durham, NC 27707

ABC Store Cooler Renovations for Multiple ABC Stores
Alteration
Results
$66,803 est. value
Durham, NC 27703

Fletcher Theater`s Architectural Lighting Controls Upgrade
Alteration
Post-Bid
Raleigh, NC 27601

Z2da--Site Electrical Upgrades
Term Contract
Post-Bid
$1,000,000 to $2,000,000 est. value
Durham, NC 27705

RV Campsite Electrical Improvements for Holly Point and Rolling View Campgrounds
Results
$1,823,000 est. value
Durham, Wake Forest, NC 27703

Park Transformer Replacement Project (Informal)
Alteration
Results
$171,630 est. value
Raleigh, NC

J061--36 Months Breaker Testing
Term Contract
Results
Durham, NC

Conduit Maintenance
Results

Z2DA--Power Distribution System Upgrade
Results
$1,000,000 to $5,000,000 est. value
Durham, NC

Page Hall Renovation
Renovation, Alteration - 31,000 SF
Design
Raleigh, NC 27695

Design and Installation of a Photovoltaic Electrical Generation System
Alteration
Results
Durham, NC 27704

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Last Updated 02/22/2022 11:51 AM
Project Title

Kenan Labs-Electrical Systems Upgrade

Physical Address View project details and contacts
City, State (County) Chapel Hill, NC   (Durham County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The demolition phase will include removal of the existing service entrance switchboard three existing utility transformers and service entrance bus duct. The new work phase will include the installations of a new service entrance rated switchboard, utility transformer, underground primary and secondary ductbanks, and the interception of the existing feeders and bus ducts fed from the existing switchboard scheduled to be demolished

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents