Similar Projects
General Contractor Services for the Layton City Fire Station 54
New Construction
Bidding
$1 to $3,310,000 est. value
Layton, UT

New Construction of Fire Station 62
New Construction - 15,000 SF
Post-Bid
Less than $6,000,000 est. value
Spanish Fork, UT

Moab BLM Fire Station
- 7,067 SF
Post-Bid
Moab, UT

Moab Wildfire Station
New Construction - 5,000 SF
Results
$1,500,000 to $3,000,000 est. value
Moab, UT 84532

Airport Fire Stations 11 and 12 Roof Replacement/Solar Panels
Results
Salt Lake City, UT 84122

Murray City Fire Station 18 Construction Services
Construction
Murray, UT

Construction Manager/General Contractor Services - Police and Fire Station 64
New Construction - 35,000 SF
Construction
Less than $11,200,000 est. value
South Jordan, UT

South Davis Metro Fire Station 84 Facility and Parking Upgrade
Post-Bid
Bountiful, UT 84010

Remodel of Ogden City Fire Station 4
Renovation
Results
Ogden, UT 84401

Draper City Police Building Remodel
Renovation
Construction
$200,000 to $250,000 est. value
Draper, UT 84020

Fire Station 52 CM/GC Services
Post-Bid
$4,750,000 to $5,000,000 est. value
American Fork, UT 84003

Elmo Town - Fire Station Addition
Addition - 2,000 SF
Results
Less than $400,000 est. value
Price, UT 84521

Torrey Fire House
Addition - 9,300 SF
Post-Bid
Fruita, UT 84775

Fire District Office - Milford
Results
Less than $586,481 est. value
Milford, UT 84751

Station 115 Kitchen Remodel
Renovation
Post-Bid
Copperton, UT 84006

Reported 01/31/2020 01:50 PM
Project Title

DFCM Construction-Standard Low Bid-DHS/DJJS Dixie Area Detention Center Renovation-19426430

Physical Address View project details and contacts
City, State (County) Hurricane, UT 84737   (Washington County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Construction Commenced November 2019
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project described herein is the Washington City Police Building. This work shall include all labor, materials, equipment, fixtures, and devices for the entire mechanical work and a complete operating and tested installation as required for this project.

Details

1 Fire/Police Station, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents