Similar Projects
Last Updated | 10/23/2021 12:47 AM |
Project Title | Sporting Hill Turn Lanes and Center/21st Street Intersection |
Physical Address | View project details and contacts |
City, State (County) | PA (Cumberland County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Part 1 Project Initiation, Site Visit and E&E Scoping - SR 1013-TBD Part 2 Required preliminary engineering services may involve, but are not limited to: project management, administration and meetings; field surveys; environmental studies (including historic and archaeological resources investigations, hazardous waste evaluations, wetland identification, delineation and mitigation, Section 4(f) evaluations, PNDI and threatened and endangered species research); Categorical Exclusion Evaluation preparation; subsurface utility investigation; preliminary plans preparation (including roadway, maintenance and protection of traffic, signing and pavement marking, utility, drainage, right-of-way); field view(s); Design Review meeting submission; pavement design; preliminary erosion and sedimentation control plan/NPDES permit preparation; PUC and railroad coordination; Quality Development Preparation and ASTA Powerproject scheduling. Part 3 Required final design services may include but are not limited to: project management, administration and meetings; field surveys; final plans preparation (including roadway, maintenance and protection of traffic, signing and pavement marking, utility, drainage, right-of-way); traffic signal plans, final structure plan preparation; utility coordination; final erosion and sedimentation and control plan/NPDES permit preparation; railroad coordination (including preparation of deliverables for railroad review) with Norfolk Southern, PUC coordination and all PUC deliverables ASTA Powerproject scheduling; and plans, specifications and estimate preparation Part 4 Construction Consultation/Shop Drawing Review Part 5 Project Initiation and E&E Scoping - SR 1006-TBD Part 6 Required preliminary engineering services may involve, but are not limited to: project management, administration and meetings; field surveys; environmental studies (including historic and archaeological resources investigations, hazardous waste evaluations, wetland identification, delineation and mitigation, Section 4(f) evaluations, PNDI and threatened and endangered species research); Categorical Exclusion Evaluation preparation; subsurface utility investigation; preliminary plans preparation (including roadway, maintenance and protection of traffic, signing and pavement marking, utility, drainage, right-of-way); field view(s); Design Review meeting submission; pavement design; preliminary erosion and sedimentation control plan/NPDES permit preparation; PUC and railroad coordination; Quality Development Preparation and ASTA Powerproject scheduling. Part 7 Required final design services may include but are not limited to: project management, administration and meetings; field surveys; final plans preparation (including roadway, maintenance and protection of traffic, signing and pavement marking, utility, drainage, right-of-way); traffic signal plans, final structure plan preparation; utility coordination; final erosion and sedimentation and control plan/NPDES permit preparation; railroad coordination (including preparation of deliverables for railroad review) with Norfolk Southern, PUC coordination and all PUC deliverables ASTA Powerproject scheduling; and plans, specifications and estimate preparation. Part 8 Construction Consultation/Shop Drawing Review |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |