Similar Projects
Traffic Signs
Infrastructure
Bidding

Traffic Signs
Infrastructure
Bidding

Traffic Signal Maintenance Contract
Term Contract, Infrastructure
Post-Bid
Davenport, IA

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

Traffic Signal Upgrade and Curb Ramp Repair
Results
$1,475,000 est. value
Cedar Rapids, IA

First Ave West Pavement Rehabilitation and Traffic Signals
Results
$2,470,000 est. value
Cedar Rapids, IA 52407

WCRP Pedestrian Loop Trail
Infrastructure
Bidding
$220,000 est. value
Urbandale, IA

Traffic Signal Poles
Term Contract
Post-Bid
Cedar Rapids, IA

Hickory Grove Signalization
Infrastructure
Results
Davenport, IA 52805

Reconstruction Long Term Parking Lot E, Construction Long Term Parking Lot G & H2 Expansion Phase 2
Infrastructure
Post-Bid
Cedar Rapids, IA 52404

Traffic Signalization 88th Street and Ashworth Road
Infrastructure
Results
IA 50266

Traffic Signal Controller/Cabinet
Infrastructure
Post-Bid
Ames, IA

Orchard Street Reconstruction
Infrastructure
Results
$1,220,000 est. value
Iowa City, IA

Iowa Highway 141 SB and Iowa Highway 44 Traffic Signal And Turn Lane Improvements
Infrastructure
Results
$421,700 est. value
Grimes, IA 50111

Hillandale Road and Research Parkway Reconstruction Project
Infrastructure
Results
Davenport, IA 52806

Last Updated 03/04/2022 12:11 PM
Project Title

Digital Enterprise Interstate Crossing

Physical Address View project details and contacts
City, State (County) West Des Moines, IA 50266   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The West Des Moines Digital Enterprise Interstate 35 Crossings project includes the installation of a within public right-of-way crossing Interstate 35 at Westown Parkway and EP True Parkway. The project involves installation of Contractor provided vaults. This project also involves supplying and installing conduit, casing, tracer wire, test stations and other ancillary items required for a complete and functional conduit network for the future installation of fiber optic cables.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents