Similar Projects
Fire Station 70
New Construction
Conception
$1,580,000 est. value
Phoenix, AZ 85029

Fire Station No. 8
New Construction - 14,150 SF
Conception
$14,251,320 est. value
Peoria, AZ

Northeast Fire Station 222
New Construction - 52,000 SF
Design
$28,700,000 est. value
Mesa, AZ

Blue Horizons Fire Station
New Construction - 12,750 SF
Design
$6,700,000 est. value
Buckeye, AZ

Police Dispatch Center Expansion (PM/CM)
Renovation - 10,600 SF
Post-Bid
Gilbert, AZ

Construction Manager at Risk (CMAR) Services for Fire Station 282 Reconstruction
Renovation
Post-Bid
Chandler, AZ

Construction Manager at Risk for Project 26 Replace Deteriorating Vehicle Training Track
New Construction, Renovation
Results
$19,000,000 est. value
Tempe, AZ 85281

CMAR and Construction Administration Services of A Fire Station
Results
Avondale, AZ 85323

Goodyear Police Department Building Phase II - Preconstruction and Construction
Addition
Construction
$12,000,000 to $14,000,000 est. value
Goodyear, AZ 85338

Southeast Fire Station 221
New Construction
Construction
Mesa, AZ

Northeast Police Substation
New Construction - 52,000 SF
Pending Verification
Mesa, AZ

Fire Station 4 Rebuild Project
New Construction
Pending Verification
Gilbert, AZ

Chandler Heights Substation Wellness Center
Renovation
Conception
$495,000 est. value
Chandler, AZ

Rebuild Station No. 282
New Construction - 11,600 SF
Design
$6,960,000 est. value
Chandler, AZ 85286

New Van Buren Street Fire Station
New Construction - 19,000 SF
Post-Bid
$9,425,000 est. value
Avondale, AZ 85392

Last Updated 06/27/2022 04:12 PM
Project Title

New Police Evidence Storage Warehouse Facility - CIPPS19030 - City Of Glendale

Physical Address View project details and contacts
City, State (County) Glendale, AZ   (Maricopa County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $20,190,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to design and construct a 30,000 square feet secure warehouse facility for police evidence, property storage and management. This project location and timing will be determined in FY21. As of June 24, 2022, this project is currently in the FY 2023-2032 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents