Similar Projects
Imetco Building Addition
Addition - 29,328 SF
Conception
$6,500,000 est. value
Norcross, GA 30071

City Farmers Market Expansion
Addition, Infrastructure - 1,570 SF
Conception
Snellville, GA 30039

Circle K - Lawrenceville Hwy / Lawrenceville
New Construction, Infrastructure - 6,000 SF
Design
$1,400,000 CJ est. value
Lawrenceville, GA 30044

Rowen Phase 1 Roads and Infrastructure
Infrastructure
Design
$18,000,000 est. value
Dacula, GA

Maple Creek Park New Playground Addition
Infrastructure
Bidding
$70,000 CJ est. value
Dacula, GA 30019

Evermore North Boulevard (from Hewatt Road to Parkwood Road) and (Parkwood Road to Britt Drive) Roadway Improvement Project
Infrastructure
Bidding
$15,992,795 CJ est. value
Snellville, GA 30078

Gwinnett Place Mall Redevelopment - Gwinnett County
Demolition, New Construction, Term Contract, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Duluth, GA 30096

LiDL #1517 / Norcross - Rebid
New Construction, Infrastructure - 31,109 SF
Post-Bid
$5,000,000 CJ est. value
Norcross, GA 30093

Lanier Islands Conference Center - Phase 1 - Site Preparation
Results
Buford, GA

Destination Park Improvements
New Construction, Infrastructure
Results
Loganville, GA 30052

Broadstone Peachtree Corners
New Construction, Infrastructure
Construction
$120,000,000 CJ est. value
Peachtree Corners, GA 30092

Ariston Retail - Civil Package
New Construction, Infrastructure
Construction
Buford, GA 30519

Lidl #1476 / Sugar Hill
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Sugar Hill, GA 30518

Sweetgum Road Townhouses
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Lawrenceville, GA 30045

Hamilton Mill Commercial Development
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Buford, GA 30519

Last Updated 11/04/2022 10:43 AM
Project Title

Gravel Springs Industrial

Physical Address View project details and contacts
City, State (County) Buford, GA 30519   (Gwinnett County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method To Subcontract, Bids by Invitation
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $65,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of an 848,738 square foot industrial development. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information.

Details

848,738 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents