Similar Projects
K-6 Conversion Renovations at Mozart High School
Renovation
Bidding
$660,000 est. value
Boston, MA 02131

Chelsea High School Mothers Room Renovation Project
Renovation
Bidding
$550,000 est. value
Chelsea, MA 02150

Josiah Quincy Upper School Swing Space Project - Filed Sub Bids
Post-Bid
$1,044,030 est. value
Boston, MA

Toilet Room Renovations and Repairs at Various Schools Phase 2 - General Bids
Post-Bid
Boston, MA

Mary Lyon 9-12 School - General Bids
Renovation
Results
$1,256,782 est. value
Boston, MA 02135

William McKinley K-12 School Project - General Bids
Renovation
Results
$1,996,050 est. value
Boston, MA 02116

Boston College High School - Phase 1
New Construction, Renovation
Pending Verification
$100,000,000 est. value
Boston, MA 02125

Boston College High School - Phase 2
New Construction, Renovation
Pending Verification
Boston, MA 02125

Toilet Room Renovations and Repairs at Various Schools Phase 2 - Filed Sub Bids
Post-Bid
$1,750,000 est. value
Boston, Dorchester, MA

William McKinley K-12 School Project - Filed Sub Bids
Renovation
Results
$2,513,926 est. value
Boston, MA 02116

Boston College High School - Phase 3
New Construction
Pending Verification
Boston, MA 02125

Roxbury Prep Washington Street Campus Alterations
Renovation
Post-Bid
$100,000 est. value
Boston, MA 02119

Mary Lyon 9-12 School - Filed Sub Bids
Renovation
Results
$1,256,782 est. value
Boston, Brighton, MA 02135

Locker Room Renovations at Brighton High School - Filed Sub Bids
Renovation
Post-Bid
$2,641,570 est. value
Boston, MA 02135

Boston Prep Wall Repair
Renovation
Results
$85,000 to $100,000 est. value
Boston, Hyde Park, MA 02136

Reported 05/19/2022 12:00 AM
Project Title

Demolition of Walls, Doors, and Miscellaneous Electrical, Cut and Cap Radiator, Installation of New GWB Partitions, Resilient Base, Door, and Frame, New Door Opening on CMU Wall

Physical Address View project details and contacts
City, State (County) Boston, MA 02119   (Suffolk County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $520,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the work includes but is not limited to the demolition of walls, doors, and miscellaneous electrical. Cut and cap radiator. Installation of new GWB partitions, resilient base, door, and frame. New door opening on CMU wall with the removal of the radiator. Installation of electrical items.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents