Similar Projects
Architectural Engineering And Related Professional Technical Support Services
Term Contract
Bidding
CA

As Needed Plumbing Services
Term Contract
Bidding
$200,000 est. value
CA

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Plumbing Services
Term Contract
Results
$200,000 est. value
San Jose, CA 95128

Plumbing Contractor
Term Contract
Results
Concord, CA

Maintenance and Repair of HVAC/Plumbing in Fresno County
Alteration
Bidding
$24,000 est. value
Friant, CA 93626

Plumbing Services BPA
Term Contract, Alteration
Post-Bid
Edwards, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Building A & B Modernization Project at Chester Elementary School - Plumbing
Alteration
Bidding
Chester, CA 96020

"As Needed" Plumbing Services
Term Contract
Post-Bid
Eureka, CA 95501

Orchard Dale Elementary School Modernization Project- Plumbing
Alteration
Results
Whittier, CA 90603

Plumbing Maintenance and Installation Services
Alteration
Bidding
Palm Springs, CA 92262

Plumbing Contractor Services
Term Contract
Post-Bid
Concord, CA

Glen Avon Elementary School Sitework
Renovation, Infrastructure, Alteration
Results
$1,300,000 est. value
Riverside, CA 92509

Last Updated 02/25/2022 05:19 PM
Project Title

Industrial Water Treatment Services

Physical Address View project details and contacts
City, State (County) San Diego, CA   (San Diego County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

$100,000 Annually. Shall include but not limited to the treatment and proper testing of water chemistry of steam boilers, chillers, cooling towers, and heating hot water systems. The program shall target the prevention of corrosion and scale formation in systems and all associated piping, valves and all end-point equipment. Additionally, it should be geared towards reducing water and energyconsumption. It is also the intent of this solicitation to request hydronic HVAC system water treatment and monitoring services at three (3) hydronic plant locations for the Office of Housing Administration (OHA). The services shall include installation of chemical monitoring and dispensing equipment, water treatment chemicals and on-site services. Start Date: January 2022. Project Duration: Up to 5 Years

Details

Division 01 - General Requirements, Facility Maintenance.
Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents