Similar Projects
IH 35 - Widen Road - Add Lanes
Infrastructure
Bidding
$452,781,798 est. value
Denton, TX 76209

Two-lane Roadway - Rippy Road Project
Infrastructure
Bidding
$300,000 est. value
Flower Mound, TX 75028

Jernigan Road Overlay
Post-Bid
Copper Canyon, TX 75077

Paving, Signage, and Lighting Infrastructure for Union Park Phase 6A
Post-Bid
Little Elm, TX

Silverado West Phase 2 Paving Improvements
Results
Aubrey, TX

Old Justin Road Pavement Reconstruction
Results
Northlake, TX 76226

IH 35E - Freeway Operational Improvements
Infrastructure
Bidding
$11,761,703 est. value
Denton, TX 76209

Phase 1 - Grading, Paving, and Utility Package for Stone Hill Ranch Estates
Post-Bid
TX

Bruton Orand Boulevard at FM 1171 - Right Turn Lane
Results
$252,742 est. value
Flower Mound, TX 75028

Lopo Road Reconstruction and Wood Creek Circle Reconstruction
Infrastructure
Bidding
$1,787,295 est. value
Flower Mound, TX

2021 Street Improvement
Post-Bid
Argyle, TX

Rehabilitate Existing Roadway and Add Shoulders
Results
Less than $7,848,270 est. value
TX

Cold Mix Asphaltic Pavement (CMAP)
Infrastructure
Bidding
Denton, TX

2021 Street Reconstruction Projects
Post-Bid
Aubrey, TX

Pavement Repair and Drainage Improvements
Term Contract
Results
$25,000 to $90,000 est. value
Copper Canyon, TX

Last Updated 06/27/2022 08:15 AM
Project Title

Transit Oriented Development (TOD) Agora District Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) Corinth, TX 76208   (Denton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of furnishing all labor, material and equipment, and performing all work required for paving, drainage, and utility improvements on: (1) Main Street - Corinth Parkway to Walton Drive; (2) Agora Way - North Corinth Street to Main Street; (3) North Corinth Street - Corinth Parkway to Walton Drive North Corinth Street; (4) Single-Lane Roundabout at Walton Drive.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents