Similar Projects
Dutchess County Youth Opportunity Center - Dutchess County
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Poughkeepsie, NY 12601

Water Storage Facility - Dutchess County
New Construction, Infrastructure
Conception
$6,992,700 CJ est. value
Poughkeepsie, NY 12601

Store Space Self Storage
New Construction, Infrastructure - 41,257 SF
Design
$4,400,000 CJ est. value
Poughkeepsie, NY 12601

Concrete Stoop, Steps, Sidewalk, Handrail Replacement and Masonry Chimney Repairs
Renovation, Infrastructure
Design
$400,000 CJ est. value
Poughkeepsie, NY 12601

Town of Amenia Extension of Route 44 Sidewalk
Infrastructure
Bidding
$200,000 CJ est. value
Amenia, NY 12501

Dutchess Stadium New Left Field Clubhouse, Seating Bowl and Restroom Building
New Construction, Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Wappingers Falls, NY 12590

Boardman Road Library Wastewater Line Rerouting and Site Work
Infrastructure
Post-Bid
Poughkeepsie, NY 12603

Wilcox Park Splash Pad - Rebid
Infrastructure
Post-Bid
$400,000 CJ est. value
Stanfordville, NY 12581

Fallkill Dam Rehabilitation Project
Renovation
Results
$1,000,000 to $1,300,000 est. value
Poughkeepsie, NY 12601

Beacon C.S.D. - Proj. B - Reconstr to JV Forrestal ES, Glenham ES, Sargent ES, Rombout MS - Site Work SC - B1
Infrastructure - 49,443 SF
Results
$804,804 CJ est. value
Beacon, NY 12508

Wappingers C.S.D. - 2022 District Wide Renovations - Phase 4 - Site Work - S.1
Term Contract, Infrastructure
Construction
$900,000 CJ est. value
Hopewell Junction, NY 12533

819 Main Street Mixed-Use Development
New Construction, Infrastructure - 10,634 SF
Pending Verification
$4,100,000 CJ est. value
Poughkeepsie, NY 12601

Main Street Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Beacon, NY 12508

Allspace Storage Facility Expansion
Addition, Demolition, New Construction, Renovation, Infrastructure - 43,400 SF
Design
$4,700,000 CJ est. value
Poughkeepsie, NY 12603

Concrete Aprons/Walkway
Infrastructure
Bidding
$80,000 CJ est. value
Hopewell Junction, NY 12533

Last Updated 09/27/2022 09:17 AM
Project Title

Mount Beacon Reservoir and Pocket Dam Rehabilitation

Physical Address View project details and contacts
City, State (County) Beacon, NY 12508   (Dutchess County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,758,340 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 29, 2022, project was awarded to Doyle Contracting, awarded amount is 2,161,140 for Mount Beacon Reservoir and $597,200 for Pocket Dam Rehabilitation ** For Pocket Dam, the Contractor shall: remove 1-foot of concrete and then raise the non-overflow section to EL. 429.2' and replace the foot of concrete to the spillway. The Contractor will remove the remaining deteriorated concrete from the downstream face, clear debris from the downstream channel and repoint the downstream face of the dam. The Contractor will add (2) electrical conduits into the concrete from the pump house to the new valve platform. The Contractor will add 1.5 feet of concrete to the upstream surface of the entire dam, tying into bedrock. A fall protection system will be installed, and valve operating platform will be replaced by the Contractor. Lastly, the Contractor will raise & replace the pump house door and remove and replace fencing. For Mount Beacon Reservoir Dam, the Contractor will remove all shotcrete and loose or deteriorated concrete to/from the downstream face and crest of the dam, spillway, training walls and buttresses down to the base of the entire dam. The Contractor will remove shotcrete along the downstream face and crest of the spillway and from the upstream face down to EL. 1282.0'. The Contractor will remove the south spillway channel wall connecting to the gatehouse and install drainage channels and piping in the downstream face to connect the existing drainage pipes to the new draining system at the toe of the dam. The Contractor will remove the deteriorated buttresses to a depth of 1 foot below existing ground surface and prepare for shotcrete layer along the downstream face. The Contractor will route the piping for the drainage system to run to a new weir box and then through the northern most spillway channel wall before the culvert under the access road. The Contractor will raise the non-overflow sections to EL. 1288.5', build a new spillway channel wall to the gatehouse, remove and install a new valve platform. The Contractor will install a new handrail protection system, extend the dam 19 feet on the southern end and 22 feet on the northern end, excavate the gatehouse floor and remove the existing downstream 18-inch gate valve. The Contractor will install (2) new pipe saddles, install a new 18-inch butterfly valve with extended bonnet and install a new removable steel platform floor in the gatehouse. A new shotcrete surface layer will be placed on all spillway channel walls and the downstream face of the dam. The Contractor will install a new 8-inch tap on the 18-inch C.I.P. before the gate house and install piping to a 4-foot diameter manhole that will contain a flow meter. The Contractor will then install piping with the discharge passing through the spillway channel wall just north of the gatehouse. The City of Beacon reserves the right to waive any informalities, and/or to reject any or all bids. The City will not discriminate against bidders because of race, creed, color, national origin, sex, age, disability or marital status. Each bidder must deposit with his bid security in the proper amount and form, as described and provided in the Information to Bidders and Non-Collusive Certificate. The Addenda, if any will be issued only to those persons whose name and address are on the record as having obtained the contract documents. Bids will be accepted from only those persons whose name and address are on the record as having obtained contract documents. Buyers Requirements General Requirements - Insurance Required - Prevailing Wage Required - Certification/Training - Certified Payroll Question Acceptance Deadline 05/05/2022 10:00 AM EDT Questions are submitted online No

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents