Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Black Canyon Boys and Girls Club / Montrose
New Construction, Infrastructure - 18,500 SF
Design
$4,700,000 CJ est. value
Montrose, CO 81401

Black Canyon Boys and Girls Club / Montrose
New Construction, Infrastructure - 18,500 SF
Design
$4,700,000 CJ est. value
Montrose, CO 81401

Gunnison Gorge Fencing 2022
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Montrose, CO 81401

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Woodgate Road Realignment Project
Results
$1,000,000 to $1,500,000 est. value
Montrose, CO 81402

Montrose County Justice Center South Driveway Replacement Project
Infrastructure
Post-Bid
Montrose, CO 81401

CO-Leadville NFH-Parking Lot Manhole Drain
Term Contract
Results
$25,000 to $100,000 est. value
Leadville, CO 80461

Airport Water Line Replacement Project
Infrastructure
Post-Bid
Montrose, CO

Overlay Project in Several locations within the County
New Construction, Infrastructure
Results
$5,000,000 to $20,000,000 est. value
CO

Southeast Water Transmission Main Construction Project
Infrastructure
Post-Bid
Montrose, CO 81401

Hill Street Extension Project
Infrastructure
Results
$1,200,000 est. value
Montrose, CO 81403

Last Updated 08/08/2022 04:35 PM
Project Title

RFP D/B - Project 7 Water Authority - Water Supply Resiliency Program - Water Treatment Plant (Package 1) and Waterline (Package 2)

Physical Address View project details and contacts
City, State (County) Montrose, CO 81401   (Montrose County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $94,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Water Treatment Plant Package (Package 1): is to be designed and constructed in three phases using the PDB delivery method: Phase 1 Design Basis: Prepare design to 30% level (Basis of Design) and submit to CDPHE for conditional approval. Phase 1 is complete when there is an agreement on all relevant design criteria, project phasing, treatment processes, appurtenances, and major items of equipment and the PDB team has produced a detailed cost model and an initial price proposal at 30%. Evaluation of construction means and methods, materials of construction, alternate construction or installation systems may occur informally during Phase 1 but should be generally reserved for Phase 2 Design and Preconstruction Services. Phase 1 Deliverables Basis of Design Report Conceptual Drawings Preliminary schedule Phase 2 Design and Preconstruction Services: Prepare design to 60% (Preliminary Design), submit application for construction approval to CDPHE, and prepare a Phase 3 Proposal. Phase 2 is completed when there is agreement on the Project schedule and a stipulated cost proposal has been accepted. Phase 2 Deliverables Required plans and specifications for CDPHE approval Stipulated cost proposal with the detailed program schedule/implementation plan, an updated risk register, and summary of key design assumptions Phase 3 services: Complete design, procurement of subcontractors and vendors, self-performance of certain elements of the construction (where permitted and at the P7WA's discretion), and full construction and commissioning. Waterline Package (Package 2): is to be designed and constructed in two phases and amended into the prime contract: P7WA's OA will prepare design documents in conjunction with completing the National Environmental Protection Act (NEPA) Environmental Assessment (EA) and acquiring easements along the pipeline corridor. P7WA's 30% waterline design package will include topographic survey tied to rights-of-way and parcel boundaries, completed property abstracts and research for impacted properties, and a final waterline alignment. P7WA intends to combine the Waterline Package (#2) into the project in one of the two ways described below. The method of Contractor Selection has not been Determined at this time.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents