Similar Projects
The Village at Oakland Park
New Construction
Conception
Oakland Park, FL 33311

Lee Square
New Construction - 24,120 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33463

CenterPlace - Master Plan
New Construction - 30,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fort Myers, FL

Naples Beach Hotel & Golf Club Redevelopment
New Construction, Demolition
Design
$10,000,000 CJ est. value
Naples, FL

City of Inverness Wallace Park, Liberty Park, Downtown Depot and Water Tower
Post-Bid
Inverness, FL

Orlando Tennis Center
Post-Bid
Less than $5,500,000 est. value
Orlando, FL

Foxtail Palm Park Improvements
Results
Less than $603,741 est. value
Palm Springs, FL 33461

Newsom High School Construction of ROTC Obstacle Course Construction
Results
Less than $100,000 est. value
Lithia, FL 33547

The Gatherings at Lake Nona
New Construction - 195,460 SF
Construction
Orlando, FL 32827

KOA Campground
New Construction
Construction
$3,384,744 est. value
Fort Pierce, FL 34981

Oakland Park Place
New Construction - 291,212 SF
Design
$560,000 est. value
Oakland Park, FL 33334

Celebration Elementary Playground Artificial Turf Modifications
Post-Bid
Celebration, FL 34747

Lynn Haven Sports Fields Improvements Cain Griffin Park
Results
Lynn Haven, FL 32444

Lake Lorna Doone Park Improvements - Phase II
New Construction, Renovation, Demolition
Construction
$8,000,000 est. value
Orlando, FL 32805

Pine Island Park Reconstruction
Post-Bid
Less than $7,416,001 est. value
Plantation, FL 33324

Last Updated 11/06/2020 09:00 PM
Project Title

Playground Cover and Basketball Court Improvement at Kissimmee Charter Academy

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34744   (Osceola County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project goals: The purpose of this project is to provide all labor, material, permitting, and supervision required for the build of: a. A covered Metal Roof over the playground area and, b. To enlarge the existing outdoor Basketball court concrete area and to provide a Metal roof over the basketball court area Summary of project services: a. Playground Area: Prepare the site for the new covered roof and repair and patch all concrete and ground surfaces as required. Provide design, engineering, and installation of a metal structure and roof at the playground, including, but not limited to, required permits, foundations, structure, drainage, power, conduits, led lights, and any other associated items for a complete turnkey project. The metal structure and roof shall closely match the other metal structures and roofs at this school. b. Basketball Court: Demolish existing basketball hoops and prepare existing concrete slab edge for expansion. Provide design, engineering, and installation of the additional concrete area to enlarge existing concrete court to be sufficient for a full-size basketball court and an additional 8’ apron along the court length. Please note that the court must have a minimum of 1% slope in one plane to guarantee the removal of water. Prepare and refinish basketball court concrete surfaces and apply coating using “Acrylotex” or approved equal, prime, and paint court lines to the high school basketball regulation specifications. Provide, engineer, and install 2 (Two) in-ground basketball goal hoops at regulation height patch all concrete areas as required. Also, supply 2 (two) portable regulation height retractable basketball hoops. Provide design, engineering, and installation of a metal structure and roof at the basketball court and apron, including, but not limited to, required permits, foundations, structure, drainage, conduits, power, led lights and any other items for a complete turnkey project. Regrade and re-sod the area around the court for proper drainage. The metal structure and roof shall closely match the other metal structures and roofs at this school.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents