Similar Projects
Village Drive and Tawney Ridge Lane Traffic Signal
Infrastructure
Sub-Bidding
$600,000 CJ est. value
Victorville, CA 92394

Shaffer Mountain Project - Conduit Installation
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Susanville, CA 96130

H--LBAO Generator Maintenance Services
Term Contract
Post-Bid
Carson City, Nixon, NV 89424

Emergency Generator Maintenance
Term Contract, Alteration
Post-Bid
San Diego, CA 92101

LAUS Wires And Cables
Alteration
Results
Less than $1,300,000 est. value
Los Angeles, CA 90081

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Generator Installation
Renovation
Construction
$2,028,300 CJ est. value
Hemet, CA 92543

Holiday Lighting Design and Installation
Term Contract
Sub-Bidding
Coachella, CA 92236

Generators and Enclosures
Alteration
Post-Bid
Vacaville, CA 95688

Electrical MSB (Labor/Equipment Only)
Alteration
Results
Quincy, CA 95791

Building X - 5KV Switch Replacement Project
Renovation
Sub-Bidding
$175,000 CJ est. value
Long Beach, CA 90810

J045--Fuel Filtering/Underground Tanks / Generators
Term Contract
Post-Bid
Loma Linda, CA 92357

FMS Paving and Lighting
Infrastructure, Alteration
Results
$1,500,000 est. value
Los Alamitos, CA 90720

Exterior Lighting Maintenance and On-Call Repair Services
Term Contract
Sub-Bidding
Auburn, CA 95603

Electric Service Upgrade at Five School Sites
Renovation, Infrastructure
Post-Bid
Whittier, CA 90603

Last Updated 09/08/2022 02:04 AM
Project Title

Civic Park Electrical

Physical Address View project details and contacts
City, State (County) Hanford, CA 93230   (Kings County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

NOTE: Bidders must be on the City's plan holders list to bid. Bids are required for the entire work as described herein: Provide and pull electrical wire from beginning and end points detailed in attached scope, provide and install conduit and wiring to steel cabinet to contain cam locks for ice rink chiller, provide and install steel cabinet mounted by steel poles and strut. Make connections at existing switch gear to existing 400A 3p breaker. Make connections at steel cabinet for cam locks. Determine and provide "extension cords" for cam lock connections to chiller. Install two 30x48 pull boxes in designated areas (provided by the City of Hanford). Preform and provide all other labor and ancillary items for full power connection as required for ice rink chiller as described. If there are any questions, please direct them to: Randy Shaw, Building Superintendent, City of Hanford, 321 N Douty St., Hanford, California 93230, (559) 585-2148, rshaw@cityofhanfordca.com. An executed copy of the contract and purchase order will be issued to the successful bidder that shall constitute acceptance of the Bidder's Proposal. No bids will be accepted from a Contractor who has not been licensed in accordance with the provisions of Chapter 9, Division 3 of Business and Professions Code. The City reserves the right to reject any or all bids. In accordance with the provisions of Section 1770 to 1781 of the Labor Code, the City of Hanford has ascertained that the general prevailing rate of wages applicable to the work being done is as per wage scale on file in the City Engineer's office. The Contractor to whom the contract is awarded shall pay not less than the specified wages to all workmen employed in the execution of the contract. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. In accordance with the provisions of Section 1770 to 1781 of the Labor Code, the City of Hanford has ascertained that the general prevailing rate of wages applicable to the work being done in Kings County is as per wage scale on file in the City Engineer's office. The Contractor to whom the contract is awarded shall pay not less than the specified wages to all workmen employed in the execution of the contract. The (Title o(Recipient), in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US. C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Construction Contracts under $25,000, and Maintenance Contracts $15,000 and under are EXEMPT from some prevailing wage requirements, including DIR registration, and DIR notification of award. Prevailing wage is required for any project over $1,000, and the Contractor is responsible for keeping certified payroll records. If the project does not fall within the EXEMPT limits, the Contractor must provide the DIR numbers of the prime and all sub contractors on the contract. The City will report the award of the project before the work begins, or up to 30 days after award, whichever occurs first.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents