Similar Projects
Elizabeth G Lyons Elementary School
Design
$33,800,000 to $43,890,000 est. value
Randolph, MA

Real Estate Design and Engineering Services
Term Contract, Infrastructure
Bidding
Boston, MA

Real Estate Design and Engineering Services
Term Contract, Infrastructure
Bidding
Boston, MA

Lindens and Vernon/Harris Neighborhoods Survey Update
Post-Bid
Brookline, MA

On-Call Designer Services
Term Contract
Post-Bid
$1,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

Wastewater Facilities Management Plan
Term Contract
Bidding

Construction Inspection IDIQ (MATOC)
Post-Bid
Less than $100,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Athletic and Recreation Field Feasibility Study Services - Coakley Middle School Lower Field
New Construction, Alteration
Bidding
Norwood, MA 02062

Geotechnical A-E IDIQ
Post-Bid
Less than $4,000,000 est. value

Operations and Maintenance Engineering Enhancement
Results
Less than $990,000,000 est. value

Study and Design for General Building Renovations, Repair and Upgrades
New Construction
Bidding
Boston, MA

Supervisory Electrical Engineer
Post-Bid
Wellesley, MA 02481

Reported 02/26/2022 12:00 AM
Project Title

Pedestrian Bridge Replacement Phase 1

Physical Address View project details and contacts
City, State (County) Brookline, MA   (Norfolk County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 01/20/22
Owner View project details and contacts
Architect View project details and contacts
Description

While work associated with concept and cost development represents the majority of the Phase I scope, an integral part of the scope will also be the due consideration of the benefit(s) of the pedestrian bridge replacement. Transportation demand and benefits analyses assess connectivity, pedestrian/bicycle movements, desire routes, safety, universal access, neighborhood or institutional/commercial draws or destinations, and alternative routes in the absence of a footbridge replacement.

Details

Architectural, New Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents