Similar Projects
Rehabilitation of Bridge No 03998 Ferry Street o/ Amtrak RR New Haven
Bidding
$2,500,000 to $4,999,999 est. value
New Haven, CT 06508

Rehabilitation of Bridge 04105 Memorial Boulevard Over Pequabuck River
Bidding
Bristol, CT 06010

Replacement of Bridge No. 04760 Woodstock Avenue 1 Over Little River
Post-Bid
$1,000,000 to $2,499,999 est. value
Putnam, CT 06260

Bridge No. 072001 School House Road at Blissville Brook Project
Post-Bid
Lisbon, CT

Rehabilitation of Bridge No. 04746 Sunnyside Street Over the Yantic River
Results
Norwich, CT 06360

Structural Monitoring System PHM Bridge
Results
$1,000,000 to $2,499,999 est. value
New Haven, CT 06501

Mud Pond Road and Gaylord Road Bridge Replacement
Bidding
New Milford, CT

Canterbury Bridge No. 04424: Miller Goodwin Connector at Little River Project
Post-Bid
Canterbury, CT 04424

Rehabilitiation of Paper Mill Road Bridge No 05528
Results
Less than $305,601 est. value
Colchester, CT 06415

Rental of Bridge Repair Units
Bidding
Hartford, CT

Replacement of Hillyndale Road Culvert over Eagleville Brook
Post-Bid
Mansfield, CT

Replacement of Bridge No. 037005 Indian Lane Over Parmelee Brook
Results
Durham, CT

Rehabilitation of Bridge Nos 05169 and 05959 Wood Creek Road Over Weekeepeemee River and Magnolia Hill Road Over East Spring Brook
Post-Bid
Bethlehem, CT 06751

Riverside Road and Drake Hill Road Pavement Rehabilitation and Bridge Repairs at Bridge No. 05637
Results
Less than $481,138 est. value
Simsbury, CT 06070

Replacement of Bridge No. 04964 - Cavalry Road over West Branch Saugatuck River
Post-Bid
Weston, CT

Last Updated 03/16/2021 09:59 AM
Project Title

Blain Road Pedestrian Bridge at West Thompson Lake

Physical Address View project details and contacts
City, State (County) North Grosvenor Dale, Thompson, CT 06255   (Windham County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of restoring the pedestrian crossing over the Quinebaug River on Blain Road by utilizing an approximately 85-foot, single span, pre-manufactured steel bridge. This bridge will be for pedestrian use only (5-feet wide) and shall not be sized for vehicular loads. Incidental work to include: clearing and grubbing of grasses, shrubs and trees to better access the site, riprap installation to stabilize the areas immediately adjacent to new construction, protection of the existing historical abutments, erosion control measures to prevent construction site runoff of loose or disturbed soils, and construction of cast-in-place bridge abutments (with wingwall). Contractor will be provided a temporary storage and staging area along the West Thompson Dam Trail (east side of crossing).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents