Similar Projects
Brantley Ellison Fitness / Biloxi
New Construction, Infrastructure
Conception
Biloxi, MS 39532

Collins Street Residences
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Biloxi, MS 39530

Blue Water Beach
Demolition, New Construction, Infrastructure
Design
$410,000,000 CJ est. value
Diberville, MS 39540

Flamingo Beach Inn & Comfort Inn/Choice Hotels Redevelopment
New Construction, Renovation, Infrastructure
Design
$15,000,000 CJ est. value
Biloxi, MS 39531

Clower Thornton Nature Park Trail Improvement Project
Infrastructure
Bidding
$2,347,000 CJ est. value
Gulfport, MS 39507

Construction of the Davis Avenue Municipal Parking Lot Expansion
Infrastructure
Bidding
$100,000 CJ est. value
Pass Christian, MS 39571

CTA Tram, Bike & Pedestrian Bridge
Infrastructure
Post-Bid
$200,000 CJ est. value
Gulfport, MS 39501

Rehabilitate Airfield Drainage Phase 2B FAA Airport Improvement Program Project
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Gulfport, MS 39503

Hiller Park Boat Launch Improvements
Infrastructure
Results
$448,560 CJ est. value
Biloxi, MS 39531

Anniston Elementary Addition
Addition, Demolition, Renovation, Infrastructure
Results
$3,519,000 CJ est. value
Gulfport, MS 39507

Jiffy Lube / D'iberville
New Construction, Infrastructure - 3,438 SF
Construction
$1,500,000 CJ est. value
Diberville, MS 39540

Jiffy Lube / D'iberville
New Construction, Infrastructure - 3,438 SF
Construction
$1,500,000 CJ est. value
Diberville, MS 39540

The Bella Condominiums
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Biloxi, MS 39530

Hillside Baptist Church / Harrison County
New Construction, Infrastructure - 4,320 SF
Pending Verification
$750,000 CJ est. value
Gulfport, MS 39503

Souvenir City Warehouse
New Construction, Infrastructure
Design
$500,000 CJ est. value
Biloxi, MS 39531

Last Updated 08/23/2023 06:09 PM
Project Title

Gulfport Luxury RV Resort – Phase II – Multi Use Building / Gulfport

Physical Address View project details and contacts
City, State (County) Gulfport, MS 39507   (Harrison County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work and new construction of a 6,509-square-footretail development. As of August 23, 2023, a general contractor has not yet been selected for this project. A firm construction timeline for this project has not yet been released. According to the general contractor, sub-contractors from the entire Gulf Coast area are encouraged to apply for this opportunity.

Details

6,509 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents