Similar Projects
Walk Thru Metal Detectors (WTMD)
Post-Bid

Merrillville High School Secure Entrance
New Construction
Post-Bid
Merrillville, IN 46410

Hammond Central High School - Technology and Black Box AV Systems
Renovation
Results
Hammond, IN 46320

Coffee Station for the Area Career Center
Results
Hammond, IN 46320

Crown Point Christian School Classrooms
Addition
Construction
$2,000,000 est. value
Saint John, IN 46373

Crown Point Christian School Classrooms Phase II
Addition
Pending Verification
$2,000,000 est. value
Saint John, IN 46373

Custodial Equipment
Alteration
Post-Bid
Merrillville, IN

Hanover Central Middle School
Renovation, Addition
Results
Less than $5,000,000 est. value
Cedar Lake, IN 46303

Middle School Bid Package No. 1
New Construction
Post-Bid
Crown Point, IN

Hanover Central High School
Renovation, Addition
Results
Cedar Lake, IN 46303

40-Inch High Flow Planer Attachment for Skid Steer
Term Contract
Post-Bid

Resource Center
New Construction
Results
Cedar Lake, IN 46303

Heavy Duty Skid Steer With High Flow Hydraulics
Term Contract
Post-Bid

36-Inch Double Drum Steel Asphalt Roller
Alteration
Results

L C Highway - Two (2) Backhoe Loaders
Alteration
Post-Bid
Crown Point, IN

Last Updated 02/23/2022 08:38 AM
Project Title

Flight Type Dish Machine

Physical Address View project details and contacts
City, State (County) Merrillville, IN 46410   (Lake County)
Category(s) Education, Single Trades
Sub-Category(s) Equipment, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

? Receive and uncrate the new equipment. ? Prep and deliver the new equipment. ? Uninstall, remove, and dispose of the existing FT dish machine. ? Set new equipment in place. ? Assemble the new FT and make all internal utility connections. ? Run 1/2" copper water lines. Make all internal plumbing connections. Install needed RPZ valves. ? Connect the new machine to the existing water lines. ? Install copper drain lines to the existing floor drain on the load end. ? Electrical: Install a disconnect and whip. Two-point connection requiring 90/45amp breakers ? HVAC: Remove existing pant legs. Measure and fabricate a new 16" SS vent. ? Deliver and install a new vent to connect the new equipment to the existing vent at or below ceiling level. ? HVAC above the ceiling and working exhaust fans are the responsibility of the customer. ? Make all final connections. ? Test unit for proper operation and temperatures. ? Perform factory start-up. ? Clean area of all rubbish and debris ? Installation of a WS80 Water Softener: ? Receive and uncrate the new equipment. ? Prep and deliver the new equipment. Set new equipment in place. ? Plumbing: Run 1/2" copper water line and final connection. ? Test unit for proper operation and temperatures. ? Perform factory start-up. ? Clean area of all rubbish and debris ? This dish machine will have an additional 6-month Hobart standard warranty added to the standard factory warranty of 12 months. This 18-month warranty will take effect after all of the startup forms are completed.

Details

Middle/Senior High School, Addition.
Division 11 - Equipment, Cleaning and Disposal Equipment, Commercial Dishwashers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents