Similar Projects
Water Treatment Plant Improvements Phase II (5.0 MGD)
Post-Bid
$11,700,000 est. value
Granbury, TX

Star Ranch Section 7 Phase 7 - Street Excavation and Drainage, Water, Wastewater, and Erosion Control Improvements
Post-Bid
Round Rock, TX 78664

Acton Municipal Utility District WWTP No. 1 CMAR
Results
Less than $7,000,000 est. value
Granbury, TX

Waste Water Treatment Plant Aeration Basin Improvements
Results
TX

Celina WWTP Improvements
Construction
$11,806,900 est. value
Celina, TX

Northeast WWTP Inclined UV Disinfection System Upgrades
Post-Bid
TX

Wastewater and Lift Station Improvements Phase III Project
Results
Less than $612,000 est. value
TX

Wastewater Treatment Plant
Post-Bid
Cameron, TX

Encanto Real Utility District - 0.125 MGD Wastewater Treatment Plant Expansion
Results
$1,400,000 est. value
TX

Buda WWTP Phase III Expansion
Post-Bid
Buda, TX 778610

Wastewater Collection System Rehabilitation and Renewal
Results
Less than $5,000,000 est. value
Houston, TX

Repair or Alteration of Sewage and Waste Facilities
Post-Bid
$1,000,000 to $5,000,000 est. value
Terlingua, TX 79834

Meyer Ranch WRRF Site Package 2
Results
TX

Granbury Phase I Wastewater System Improvements
Post-Bid
$11,700,000 est. value
Granbury, TX

Phase 2 - Oak Grove WWTP Improvements
Results
$3,750,000 est. value
TX

Reported 03/01/2019 12:00 AM
Project Title

Terrell Kings Creek WWTP Phase I Improvements

Physical Address View project details and contacts
City, State (County) Terrell, TX   (Kaufman County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description Upgrades to the existing Terrell Kings Creek Wastewater Treatment Plant. More specifically, the project includes, but is not limited to construction of the following: Constructing enhancements to existing grit chambers and existing hydraulic junction structures, constructing a new primary clarifier with scum pumping facilities and a new primary sludge pump station, constructing enhancements to piping and sludge metering at an existing solids building, construct new chemical feed and storage facilities for coagulants, and the rehabilitation and enhancement of an existing primary clarifier. The project includes demolition, new facilities, and facility enhancement throughout the plant. The project includes an associated array of piping enhancements and civil/yard enhancements, together with electrical, instrumentation, and control enhancements to develop a complete and functional facility.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents