Similar Projects
Constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31)
Bidding
$2,050,935 to $2,506,698 est. value
AL

South - Regional Construction MATOC
Bidding
$500,000 to $1,000,000 est. value

UAB Parking Lot 15C Redesign/Repave
Post-Bid
$250,000 to $300,000 est. value
Birmingham, AL

Southern Region Disaster Recovery Support BPA
Post-Bid

Contract Resurfacing 2018- Group 2
Results
AL

Bessemer Third Avenue Streetscape Improvements
Results
Less than $450,000 est. value
Bessemer, AL

UAB - Hansell/Hulsey Center Sculpture Yard Paving
Bidding
$50,000 to $55,000 est. value
Birmingham, AL 35294

Rosedale Sidewalk Improvements Phase 6
Post-Bid
Homewood, AL

Repaving Drives at the Hickory Grove Housing Community
Results
Birmingham, AL

Constructing the Pavement Rehabilitation (Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe)
Bidding
$7,594,529 to $9,282,203 est. value
AL

Express Lot 4 - Temporary Parking Improvement
Post-Bid
$90,000 to $100,000 est. value
Birmingham, AL 35294

Constructing the Planing, Resurfacing, Guardrail Improvements, and Traffic Stripe
Results
$15,849,454 to $19,371,555 est. value

Constructing the Micro-Milling, Resurfacing, and Traffic Stripe
Bidding
$2,607,764 to $3,187,267 est. value
AL

UAB Parking Lot 15N Addition
Post-Bid
Less than $500,000 est. value
Birmingham, AL 35233

Constructing the Planing, Resurfacing, Guardrail Replacement, and Traffic Stripe
Results
$7,019,187 to $8,579,006 est. value
AL

Last Updated 03/27/2019 09:32 AM
Project Title

Bessemer CDBG Paving & Sidewalk Improvements at City Hall & Debardeleben Park

Physical Address View project details and contacts
City, State (County) Bessemer, AL 35020   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $550,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1,800 tons of bituminous wearing surface overlay (140 - 165 lbs/sy) on 4 City street locations adjacent to City Hall and Debardeleben Park. Project includes select milling, patching and leveling of existing pavement as directed by the Engineer, adjustment of underground utility riser tops, installation of traffic striping, markings/legends, pavement markers, and associated traffic control/ erosion control. Project also includes replacement of approximately 550 square yards of existing sidewalk and curb ramps to meet current ADA standards for accessible design.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents