Similar Projects
Scooters Coffee / Galesburg
New Construction, Infrastructure - 668 SF
Design
$200,000 CJ est. value
Galesburg, IL 61401

Greenhouse and Lab Space
New Construction, Infrastructure
Design
$147,000 CJ est. value
Knoxville, IL 61448

HMA Edgeline Repairs
Infrastructure
Bidding
$500,000 CJ est. value
Knoxville, IL 61448

HMA Edgeline Repairs
Infrastructure
Bidding
$500,000 CJ est. value
Knoxville, IL 61448

HMA Patching on IL 167
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Oneida, IL 61467

HMA Patching on IL 167
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Oneida, IL 61467

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Resurface Pavement
Infrastructure
Results
Less than $500,000 est. value
Galesburg, IL 61401

RR-21-4821 Pavement Repairs
Infrastructure
Results

New Library Building and Site improvements
New Construction - 70,160 SF
Construction
$13,000,000 to $13,500,000 est. value
Galesburg, IL 61401

2022 Miscellaneous Sidewalk Replacement
Infrastructure
Construction
$290,749 CJ est. value
Galesburg, IL 61401

New Science and Technology Center - Carl Sandburg College
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Galesburg, IL 61401

Hma Patching on Main Street
Infrastructure
Bidding
$500,000 CJ est. value
Gilson, IL 61436

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Last Updated 05/23/2023 05:13 AM
Project Title

2022 Wastewater Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Galesburg, IL 61401   (Knox County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $21,255,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Wastewater Treatment Plant Improvements - Phase 1. CMT PROJECT NO. 18080062.00 The work includes, but is not limited to, capacity expansion of the filter pump station, flow control structure, UV disinfection facilities, construction of new concrete channels, electrical building expansion, and back-up power. The work shall also include but not be limited to bedding, haunching, backfilling, compacting, grading and site work, electrical, controls, paving, surface restoration, and erosion/ sediment control. The successful bidder will be required to agree to not less than the prevailing rate of wages will be paid to all workmen, laborers, and mechanics performing their work under their contract. Bids will be received for a single prime Contract. Bid security shall be furnished in accordance with the Instructions to Bidders. Electronic copies of the Bidding Documents may be obtained from the Issuing Office, during the hours indicated. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. SCWRD/18003015-03 The work includes, but is not limited to the following: a. Modifications to existing diversion structures and the existing excess flow clarifier, construction of a new flow control structure, the construction of a new swirl concentrator, construction of new duplex pump stations and the corresponding piping, electrical, and sitework necessary to complete the work. b. Bedding, haunching, backfilling, compacting, grading and site work, electrical controls, paving, surface restoration, and erosion/sedimentation control. c. Additional work as further described in Section 01 23 00 Alternates and related drawings.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents