Similar Projects
Sidewalk Connection - Town of Montverde
Infrastructure
Conception
$305,000 CJ est. value
Montverde, FL 34756

The Vue at Clermont
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Clermont, FL 34711

Villa Pass
New Construction
Design
Mascotte, FL

County Road 452 From County Road 44 to Lake / Marion County Line
Infrastructure
Bidding
$600,000 CJ est. value
Eustis, FL 32726

Remodel and Addition of Fire Station 91
Addition, Demolition, Build-out, Infrastructure
Bidding
$300,000 CJ est. value
Mascotte, FL 34753

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Hyundai of Central Florida - Hyundai Genesis Dealership and Hyundai Service Expansion
Addition, Demolition, New Construction, Renovation, Infrastructure - 18,500 SF
Post-Bid
$2,130,000 CJ est. value
Clermont, FL 34711

Lake May Reserve - Site 1 Improvements
Results
Eustis, FL 32736

Contractual Services - Algae Harvesting and Biomass Reuse for Sustainable Nutrient Reduction
Alteration
Results
Less than $959,754 est. value

Panda Express - Sitework
New Construction
Construction
$2,266,630 est. value
Mount Dora, FL 32757

Victory Village Market
New Construction, Infrastructure - 7,816 SF
Construction
$6,000,000 CJ est. value
Clermont, FL 34711

Turnpike Logistics Center
New Construction, Infrastructure - 977,000 SF
Pending Verification
$63,500,000 CJ est. value
Groveland, FL 34736

Fire Station No. 34 - City of Mount Dora
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Mount Dora, FL 32757

Mount Dora Hotel Center
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Mount Dora, FL 32757

CR 42 Lane Departure Mitigation from Marion County Line to SR 44
Infrastructure
Bidding
$1,138,017 CJ est. value
Umatilla, FL 32784

Last Updated 09/08/2022 01:02 PM
Project Title

Lake May Reserve Site 5 Improvements

Physical Address View project details and contacts
City, State (County) Eustis, FL 32736   (Lake County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $825,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 8, 2022, project was awarded to Bulldog Sitework LCC but awarded amount is not available.** Lake May Reserve Site 5 Improvements Stated that Friday June 15, 2022, would be the last day for questions to be submitted. Addenda will be issued as quickly as possible after final questions deadline. Last Day to Ask Questions: 07/15/2022 Site preparation, clearing and grubbing existing wooded area, grading, construction of retention pond and swales, parking lot, asphaltic drive lane, speed humps, pavedrain system for parking spaces and sidewalks, retaining wall, vehicular entrance gate, , construction of concrete sidewalk on restroom perimeter, concrete pad for bike racks, concrete curbs, signing and pavement markings, handicap parking spaces signs (bollard mounted), ADA curb ramps and detectable warning mats, construction of a well (refer to sheet CS-14 and Exhibit F - Well System), septic system, and installation of silt fence. 2.2. Existing Precast Concrete Restroom Relocation: Contractor to remove and relocate the existing precast concrete restroom within the park facilities from Site #4 to Site #5 instead of installing a new prefabricated restroom. Refer to Construction Documents sheet CS-06 for existing and proposed restroom location. Also refer to Exhibit E - Precast Concrete Restroom Relocation and Installation Instructions for specific requirements. 2.3. Electrical Service: Contractor to furnish and install a turn-key electrical service including but not limited to installation of electrical conduit under County Road 44A by directional boring from existing utility pole located across County Road 44A to new electrical panel inside the park facility, installation of electrical conduits, conductors and electrical panels including all necessary electrical components to provide power service to the proposed restroom building and potable well system under this bid

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents