Similar Projects
Wastewater Pump Station Comminutors Project
Renovation
Bidding
VA

Rehabilitation of Activated Sludge Effluent Pump Station
Renovation
Bidding
$8,000,000 to $12,000,000 est. value
Lorton, VA 22079

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Crozet Flow Equalization Tank and Pumping Station Upgrade
Post-Bid
Charlottesville, VA

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Johnson Creek Wastewater Pump Station
Results
$8,067,444 est. value
Chester, VA 23836

St. Paul's Pump Station #156
New Construction
Construction
$3,000,000 to $3,737,570 est. value
Norfolk, VA 23504

Douglasdale, and McCloy Pumping Station Improvements Project
Renovation
Bidding
Richmond, VA 23221

Kings Trail Pump Station 234 Replacement
Post-Bid
Virginia Beach, VA

Rady Park Pump Station Replacement
Results
Warrenton, VA

Airport Road Pump Station
Renovation
Bidding
Charlottesville, VA

Langley School Pump Station and Force Main
Post-Bid
$3,400,000 est. value
McLean, VA 22101

Burton Station Sanitary Sewer Pumping Station #370
Results
$130,000 est. value
Virginia Beach, VA 23456

Snowden Pump Staion and Force Main Improvements
Renovation
Bidding
Fredericksburg, VA 22401

Construction of Lake Front Village Pump Station 309 Replacement
Post-Bid
Virginia Beach, VA 23456

Last Updated 09/21/2021 12:04 PM
Project Title

Pump Station 23 Service Area Phase 8

Physical Address View project details and contacts
City, State (County) Norfolk, VA   (Norfolk City County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method
Project Status Construction Commenced second quarter 2021, Construction Completion Expected third quarter 2022
Bids Due View project details and contacts
Estimated Value $4,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this Project consists of the installation/replacement of approximately 3,300 linear feet of PVC sanitary sewer (8 & 10-inch PVC), other associated items, such as service laterals, manholes and clean outs; approximately 3,600 linear feet 8 & 12-inch DIP water main and associated items, such as fittings, new meter boxes, and water service replacements.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents