Similar Projects
Concrete Repairs and Maintenance
Term Contract
Design
Sanger, CA 93657

Main Library Improvements Project
Renovation
Bidding
$3,555,555 CJ est. value
Oakland, CA 94612

Inland Feeder Badlands Tunnel Surge Protection Facility
Infrastructure
Bidding
$19,500,000 CJ est. value
Los Angeles, CA 90012

Bakersfield High School Warren Hall Modernization Descope Phase 2 - Teachers Lounge & Restrooms - Concrete
Renovation
Sub-Bidding
$94,685 CJ est. value
Bakersfield, CA 93304

Concrete Cutting Services
Term Contract
Post-Bid
zh, CA 93510

Annual Residential Street Rehabilitation Project (Phase 2B)
Term Contract
Post-Bid
Compton, CA 90221

Construction of Concrete Improvements in Residential Streets
Alteration
Results
Cerritos, CA

Place Minor Concrete and Highway Plants
Alteration
Results
$3,850,000 est. value
Los Angeles, CA 90081

City Hall Restroom Renovation
Renovation
Construction
$66,000 CJ est. value
Paramount, CA 90723

Dickey Parking Lot Security Gate
Infrastructure
Bidding
$285,000 CJ est. value
Fresno, CA 93721

Permanent Modular with Slab-On-Grade at Faller Elementary School
Alteration
Post-Bid
$1,000,000 est. value
Ridgecrest, CA 93555

Pavement Resurfacing - Lockwood Valley Road (West)
Infrastructure
Results
$5,582,735 CJ est. value
Maricopa, CA 93252

Del Valle Grading Project
Infrastructure
Bidding
$900,000 CJ est. value
Castaic, CA 91384

Portland Cement Concrete Materials (As-Needed)
Term Contract
Post-Bid
$35,000 est. value
Palmdale, CA

Outdoor Gym Concrete
Alteration
Results
$100,000 est. value
Lancaster, CA 93536

Last Updated 09/08/2023 09:35 AM
Project Title

Digester MCC-2 Upgrades

Physical Address View project details and contacts
City, State (County) San Rafael, CA 94903   (Marin County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,018,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Engineer's Estimate: It was inadvertently printed as $3,000,000. The correct engineer's estimate is $1,000,000. Contract Duration: Contract duration has been changed from 365 calendar days to 500 calendar days. Replacement of the existing low voltage Motor Control Center #2 (MCC-2) in the Digester Room and related power distribution equipment. The new MCC-2 shall be installed in the adjacent Shop Building. a) Demolition of existing low voltage MCC-2, existing lighting systems and wiring devices, and off-site disposal of all demolished materials. The amount of bidder's security provided must equal at least ten (10) percent of the total of the bid price for the base bid and the additive or deductive items listed in this notice. A payment or labor and materials bond in an amount of at least 100 percent of the amount. A performance bond in an amount of at least 100 percent of the amount payable by the terms of the contract. Bids that do not satisfy applicable licensing requirements will be considered non-responsive. Licenses must be issued by the Contractor's State License Board of California and must be maintained in good standing throughout the project term. The Engineer's estimate is $3,000,000.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents