Similar Projects
Pedestrian Crossing Improvements at Royalgate and Military Drive
Bidding
San Antonio, TX 78242

Walking Track - Copperfield Elementary School
Post-Bid
Converse, TX 78109

Seeling Channel Phase 3 Project
Post-Bid
$15,080,000 est. value
San Antonio, TX 78205

New Asphalt Parking Lot at 811 Jackson Street
Results
Less than $88,075 est. value
San Antonio, TX 78200

Concrete Repair and Replacement
Term Contract
Results
Schertz, TX 78154

River Walk Improvements Phase VI
Post-Bid
Less than $2,850,000 est. value
San Antonio, TX 78205

Maverick Creek Trail Connection
Results
$1,700,000 est. value
San Antonio, TX 78205

Repair and Resurfacing of the Cross Creek Apartments Parking Lot
Post-Bid
San Antonio, TX 78218

FY 2020 Flatwork TOC Package 6
Results
$2,500,000 est. value
San Antonio, TX 78205

HEB - Turn Lane Improvements
Post-Bid
San Antonio, TX

New Asphalt Parking Lot
Results
San Antonio, TX 78212

San Antonio Babcock AO Site Improvement - Parking Lot
Post-Bid
San Antonio, TX 78201

Expand 2 to 4 Lane with Median, Turn Lane, Bike Lane, Sw
Results
Less than $5,737,152 est. value
TX

Construction of Brooks Hike and Trail Connections
Results
Less than $140,000 est. value
San Antonio, TX 78204

2017 Bond Program - Pedestrian Mobility and Streets Task Order Contract Package 7
Results
$4,037,077 est. value
San Antonio, TX 78205

Last Updated 02/21/2020 08:08 AM
Project Title

Pedestrian Crossings

Physical Address View project details and contacts
City, State (County) Leon Valley, TX 78238   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide pedestrian crosswalks at the intersection of Huebner Road and Balky Street, in front of Huebner Elementary School along Huebner Road and at the intersection of Peach Tree Street at Poss Road. The scope of work includes sidewalk ramp improvements, signage and pavement markings, and traffic control as necessary per the plans to complete the work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents