Similar Projects
Pill Call Window Installation
Bidding
Decatur, Hampton, Marietta, GA 30034

Pill Call Window Installation
Bidding
Decatur, Hampton, Marietta, GA 30034

Emergency Services Complex Storefront Installation
Post-Bid
Gainesville, GA 30501

Window and Exterior Door Replacements Comer
Post-Bid
Comer, GA 30629

Roof and Window Replacement
Results
Less than $34,000 est. value
GA

Replacement of the Entry Doors at the Gwinnett Justice and Administration Center
Results
Lawrenceville, GA 30046

Exterior Window and Screen Cleaning Services
Bidding
Atlanta, GA

Safety Window Film Install
Post-Bid
$50,000 to $60,000 est. value
Evans, GA 30809

Coastal SP Glass Replacement Project
Results
Savannah, GA

Aluminum Porches Stairs Ramps and Railings for Portable Classrooms
Bidding
College Park, GA

Ocean Terminal Overhead Doors Installation
Post-Bid
Savannah, GA 31401

TCMS Classroom Solarium Project
Results
Metcalf, GA 31792

N--TSCIF Door Delivery, Installation, and Removal of Old Door and Frame
Post-Bid
Fort Benning, GA 31905

Overhead Door Maintenance and Repair
Term Contract
Results
Savannah, GA

Removal and Replacement of Access Hatches
Post-Bid
Atlanta, GA 30310

Last Updated 11/11/2019 01:22 PM
Project Title

Clerk of Courts Transaction Window/Secure Counter

Physical Address View project details and contacts
City, State (County) Clyattville, GA 31601   (Lowndes County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all management, supervision, labor, materials, supplies and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure effective performance of all services described herein. Contractor shall Design and construct a new a new wall in which the ballistic reception window will be installed. Total SF of wall is approx. 224 SF. The glazing shall include a transaction tray (at least 3" in depth) for securely passing documents through. Kevlar ballistic proof paneling, that meets UL Standard 752, Level III protection, must be installed in the new wall. Ballistic walls material shall extend from floor to slab.

Details

Division 08 - Openings, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents