Similar Projects
HVAC Units for Remaining Bond Projects
Alteration
Bidding
Carrollton, TX

SSF Terminal Roof and HVAC Replacement
Alteration
Bidding
$552,756 est. value
San Antonio, TX 78214

Purchase of Gearbox for Port San Antonio Cooling Tower
Post-Bid
San Antonio, TX 78212

Westside Annex Welders Exhaust Hood Project
Post-Bid
El Paso, TX 79922

65--Steam Sterilizers - Removal, Installation and Maintenance Sources Sought Notice
Results
Dallas, TX

Maintenance Building Rooftop Air Heater Replacement
Results
Less than $790,000 est. value
San Antonio, TX 78212

Replace Two (2) Rotary Screw Air Compressors
Alteration
Bidding
San Antonio, TX

Tippin Elementary Chiller Compressor Replacement
Post-Bid
El Paso, TX 79912

Citywide Facilities Maintenance Services
Results
DeSoto, TX 75115

HVAC Disposable Air Filters for San Antonio Airport System
Post-Bid
San Antonio, TX 78283

Closed Circuit Cooling Tower Replacement
Results
San Antonio, TX

HVAC Maintenance and Repair
Term Contract
Post-Bid
Mesquite, TX 75150

Specialized Air Conditioning Maintenance and Repair for IT Spaces (ITSD)
Results
Less than $228,700 est. value
San Antonio, TX 78200

HVAC Cleaning - JBSA RAN Bldg 693
Post-Bid
Universal City, TX 78150

Chiller Replacement at Various Campuses
Results
$2,576,523 est. value
Irving, TX 75061

Reported 11/02/2021 12:00 AM
Project Title

HVAC Preventative Maintenance Service

Physical Address View project details and contacts
City, State (County) Dallas, El Paso, Houston, San Antonio, TX 75243 (Bexar, Dallas, El Paso, Harris Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Best way to maintain peak efficiency, prevent utility overpayment, and avert system failures through predictive maintenance that can help extend the life of HVAC system performance by providing the following outcomes: 1. Increase indoor air quality and occupant comfort. 2. Increase energy efficiency of the unit 3. Prolong the life cycle of the equipment. 4. Include priority services 5. Fewer repairs and maintenance 6. Identify equipment that should be replaced.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents