Similar Projects
Timberleigh Lane & Brookvale Terrace Stormwater Improvement Project
Infrastructure
Bidding
$200,000 CJ est. value
Ballwin, MO 63021

Testing, Adjusting And Balancing Proposal Package 7
Term Contract
Post-Bid
Saint Louis, MO

Kiel Garage Drain Repairs
Alteration
Post-Bid
Saint Louis, MO 63103

Mechanical/Plumbing /HVAC Insulation Services
Alteration
Results
Columbia, MO

District Wide Drinking Fountain/Bottle Filler Installation
Alteration
Results
Hazelwood, MO

Plumbing
Renovation
Construction
$16,000 CJ est. value
Saint Charles, MO 63301

Rotary Twist Drain Assembly
Alteration
Post-Bid
Saint Louis, MO

McCracken Road Dam Rehabilitation
Infrastructure
Results
$2,000,000 CJ est. value
Ozark, MO 65721

Plumbing Services
Term Contract
Post-Bid
Mexico, MO

Installation of Flow Meter
Infrastructure
Results
$126,365 CJ est. value
Saint Louis, MO 63103

General Repair Plumber
Term Contract
Post-Bid
Warrenton, MO

Eltora Wet Weather Storage Facility
Demolition, New Construction, Infrastructure
Results
$187,986 CJ est. value
Saint Louis, MO 63130

Rockhill Steam Line Replacement
Renovation, Alteration
Post-Bid
$1,453,000 est. value
Kansas City, MO 64110

Water Main Improvements Hwy N & Z
Infrastructure
Results
$376,585 CJ est. value
Cottleville, MO 63366

Plumbing Services
Alteration
Post-Bid
MO

Last Updated 05/23/2023 10:34 AM
Project Title

Aquatic Center Plumbing Updates

Physical Address View project details and contacts
City, State (County) Eldon, MO 65026   (Miller County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Eldon is soliciting sealed BIDs for the Eldon Aquatic Center. This project is a two-part bid. Part A: Bid on replacement plumbing fixtures at the Aquatic Center using Willoughby fixtures noted in the Material List below or commercial grade porcelain fixtures that are comparable. Part B: The labor and parts needed to remove, replace, and pipe replacement plumbing fixtures. Labor will include moving and concealing the flush valves within the mechanical closet operated with a pneumatic push button mounted on the wall using front mounted back spud fixtures. Replace existing sinks in locker rooms with two-station push button pneumatic controlled stainless wash fountains. Replace showers in locker rooms with push button metering controls supplied with tempered water. Also replace fixtures and shower located within the family bathroom. Material List: 1. WC-A (Non-ADA): ETF-1490-FM-FA-12-BS-15-GWC-FV-FVT 2. WC-B (ADA): ETF-1490-FM-FA-12-BS-HC-GWC-FV-FVT 3. WC-C (ADA top spud): ETF-1490-FM-FA-12-TS-HC-GWC-FV-FVT (family) 4. LAV-1: CEL-2817-2-PPB1 5. LAV-2: HS-1014-96-HC-FA-PML1-PBH-DMS-RPT-OV-TMV (family) 6. SH-1 (Non-ADA): CWSMS-PML1-PBH-APS-1.5-TMV 7. SH-2 (ADA): CWSMS-HCA-PML1-MH2-PBH-1.5-APS-TMV 8. UR: UW-1317-HEU-BS-FV The City of Eldon reserves the right to accept or reject any or all bids and waive formalities.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents