Similar Projects
Postvale Road, Grier Road Rehabilitation Phase 2 - ST095 - Town of Marana
Infrastructure
Conception
$260,000 est. value
Marana, AZ

Tangerine Road Widening, Phase 2A - ST098 - Town of Marana
Alteration
Conception
$27,000,000 est. value
Marana, AZ 85658

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

High Water Crossing at Vamori Wash
Results
$10,000,000 to $20,000,000 est. value
Tucson, AZ 85746

Tucson - Benson Highway (I-10) (Ajo Way to MP 272)
Infrastructure
Results
$15,495,176 CJ est. value
Tucson, AZ 85706

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

South Kolb Road Self-Storage
New Construction, Infrastructure - 14,511 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85756

First Avenue - River To Grant - SR11 - City Of Tucson
Infrastructure
Conception
$71,988,200 CJ est. value
Tucson, AZ 85719

Valencia - Kolb To Houghton - SR14 - City Of Tucson
Infrastructure
Design
$22,388,700 CJ est. value
Tucson, AZ 85746

Tangerine Road Corridor Project- Phase 2B (Dove Mountain Boulevard/Twin Peaks Road to Tangerine Business Loop)
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Marana, AZ 85658

Last Updated 06/29/2023 10:17 AM
Project Title

Pines Settlement Repair

Physical Address View project details and contacts
City, State (County) Marana, AZ 85653   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $460,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes polyurethane structural foam injections on a grid pattern, at an average 10 vertical injection depth across 8,120 square feet. Concrete curb and sidewalk will not need to be drilled through, but rather injection tubes may be inserted within 6of curb and sidewalk in this area. Planned injection depths are expected to range from 5 to 12.5. Area for volume determination of measurement will be taken along the perimeter tubes and depth based on the actual subsurface penetration or refusal depth along the average end area of the proximal tube grid. The existing asphalt pavement, curb and sidewalk in this area is to remain. Potholing of existing underground waterline and other utilities including HCS (house sewer connections) with potential for conflict with this work will be mandatory prior to any drill penetration below the surface. Included in the scope of work are three (3) locations along N. Mountain Stone Pine Way, including the intersection with N. Douglas Fir Dr. Questions can be addressed to Rudy Torres at rtorres@maranaaz.gov or (520) 382-1983. Issues with the function of the Public Purchase website are best directed to Public Purchase through the "Chat" tab in the left hand side of the tool bar SCOPE OF WORK Included in the scope of work are three (3) locations along N. Mountain Stone Pine Way, including the intersection with N. Douglas Fir Dr. Work at the westernmost section includes performance of deep polyurethane structural foam injections on a 4' staggered horizontal grid pattern, at an average 10' vertical injection depth with injection tubes providing foam injection on a 15" staggered or non-staggered vertical pattern across 8,120 square feet. Concrete curb and sidewalk will not need to be drilled through, but rather injection tubes may be inserted within 6" of curb and sidewalk in this area. Planned injection depths are expected to range from 5' to 12.5'. Area for volume determination of measurement will be taken along the perimeter tubes and depth based on the actual subsurface penetration or refusal depth along the average end area of the proximal tube grid. All tubes must be cut flush and/or countersunk and permanently patched with an approved cementitious product. The existing asphalt pavement, curb and sidewalk in this area is to remain. Potholing of existing underground waterline and other utilities including HCS's (house sewer connections) with potential for conflict with this work will be mandatory prior to any drill penetration below the surface. There is a Force Account bid schedule item for potholing. Potholes shall be backfilled with aggregate base course material, and those within the roadway surface permanently patched with minimum 3" thickness of hot mix asphalt (mix #2). The costs of completing the pothole patches shall be included with the contractor's unit cost per hole. There are two other areas along N. Mountain Stone Pine Way, including the intersection at N. Douglas Fir Drive, that will have existing asphalt pavement, curb, sidewalk, driveway panels and curb access ramp removed, re-graded with ABC and replaced to restore positive surface drainage. These areas have been previously stabilized with polyurethane injections, and existing injection tubes are expected to be encountered during demolition and grading operations. The cutting, removal and disposal of injection tubes is considered incidental to the work. All areas replaced with new asphalt are to be 3" in thickness. Several sanitary sewer manholes and potable water valves will need to be adjusted to new pavement grade. Two survey monuments will need to be removed and replaced, and there is a component that requires the excavation and repair of an existing 4" dia. HCS (house connection sewer) in the right of way below existing sidewalk, which will be replaced.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents