Similar Projects
Greendale Mall Redevelopment
Renovation, Demolition - 300,000 SF
Conception
$200,000,000 est. value
Worcester, MA 01606

Montachusett Veterans Outreach Center
Renovation
Conception
$21,500,000 est. value
Winchendon, MA

91 Lancaster Road Condominiums
New Construction
Design
Clinton, MA 01510

Fitchburg Arts Community
New Construction
Design
Fitchburg, MA 01420

Curtis Apartments Revitalization
Renovation
Bidding
$55,000 to $65,000 est. value
Worcester, MA 01605

EMG Elevators Upgrade, Sunset Towers - General Bids
Renovation
Bidding
$824,377 est. value
Leominster, MA 01453

Herman Street Apartments
New Construction
Post-Bid
Worcester, MA 01610

Envelope Repairs Lincoln-Perkins Development - General Bids
Renovation
Results
Less than $570,880 est. value
Worcester, MA 01605

275 Facade Renovation at MA 12-05 Pleasant Tower Apartments - General Bids
Renovation
Results
$8,300,000 est. value
Worcester, MA 01609

Southbridge-Wells Middle School Apartments
Renovation - 118,642 SF
Construction
$21,300,000 est. value
Southbridge, MA 01550

Northgate Meadows
New Construction - 69,000 SF
Construction
Leominster, MA 01564

Village At Grafton Woods
New Construction - 149,260 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Grafton, MA 01536

Deer Street Apartments
New Construction
Pending Verification
Milford, MA 01757

Lake Street Development
New Construction
Conception
Spencer, MA

Salisbury Pine Tree Estates
New Construction
Design
Holden, MA 01520

Last Updated 12/07/2021 03:09 PM
Project Title

Waste Pipe Improvements, Belmont Tower Apartments MA 12-12 - General Bids

Physical Address View project details and contacts
City, State (County) Worcester, MA 01605   (Worcester County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,260,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. Project consists of but is not limited to: Waste stack replacement and water riser replacement. Removal and reinstallation of the kitchen cabinets will be needed to complete the work. Cutting, patching, and painting of the drywall

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents