Similar Projects
Norton Creek Flood Control - 603-60-22524 - City of Fridley
Infrastructure
Conception
$900,000 CJ est. value
Fridley, MN 55432

Anoka Metro Regional Treatment Center Miller Building Upgrade
Build-out, Renovation, Infrastructure
Conception
$6,600,000 CJ est. value
Anoka, MN 55303

St Francis Boulevard NW Residential Development
New Construction, Infrastructure
Design
$112,000,000 CJ est. value
Saint Francis, MN 55070

St Francis Boulevard NW Residential Development
New Construction, Infrastructure
Design
$112,000,000 CJ est. value
Saint Francis, MN 55070

Kellys Sample Pool Project
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Anoka, MN 55303

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Central Avenue Sewer Manhole Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Columbia Heights, MN 55421

Grading, Bituminous Surfacing, Temporary Lighting, and Temporary Signal System 0.458 Miles
Infrastructure
Results
MN

2022 Street and Utility Improvement
Infrastructure
Results
Circle Pines, MN

Andover High School Storage Garage Addition
Addition, Renovation, Infrastructure
Construction
$197,440 CJ est. value
Andover, MN 55304

Radisson Hills
New Construction, Infrastructure
Construction
$18,000,000 CJ est. value
Blaine, MN 55449

Riverdale Commons Seventh Addition / Golden Corral Redevelopment
Demolition, New Construction, Infrastructure - 8,900 SF
Pending Verification
$2,800,000 CJ est. value
Minneapolis, MN 55448

Sanctuary Lofts
New Construction, Infrastructure, Build-out
Pending Verification
$6,600,000 CJ est. value
Minneapolis, MN 55417

Rural Reserve Trunk Sanitary Sewer - 24-48200-01 - City of Andover
Renovation, Infrastructure
Conception
$3,800,000 CJ est. value
Andover, MN 55304

Turtle Ponds 6th Addition
New Construction, Infrastructure
Design
$4,100,000 CJ est. value
Saint Francis, MN 55070

Last Updated 06/08/2023 11:12 AM
Project Title

Moore Lake Park Site Improvements Project Bid Package 1

Physical Address View project details and contacts
City, State (County) Fridley, MN 55432   (Anoka County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,440,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

*Bid results have been released. This portion of the project involves: earthwork and grading, removing asphalt and parking lot curbs and replace with new. Remove pedestrian walkways and replace new. General landscaping and irrigation with plantings. Recreation courts and preparation for future playground (playground by others, not in project scope). Site utilities with connection to existing. All in accordance with plans dated 2/16/23 and prepared by WSB. All work under the contract must be completed in accordance with the Construction Manager's schedules. Direct communications regarding this Project to the office of the Construction Manager: John Nordby (john.nordby@krausanderson.com) Kraus-Anderson Construction, 501 South 8th Street, Minneapolis, MN 55404 Tel: 612-255-2432.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents