Similar Projects
Centrifugal Dewatering 12" x 8" Self-Priming Pumps - Trailer Mounted
Bidding
FL

Construction of Water Treatment Plant High Service Pumps
Bidding
$2,000,000 est. value
Lantana, FL 33462

Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Pump Control Systems, Yaskawa, Service, and Purchase of Pump Controllers, Term Contract
Term Contract
Post-Bid
FL

Sewage, Discharge and Submersible Wastewater Pumps
Term Contract
Results
Haverhill, FL 33415

Replacement of Surficial Aquifer Well HR-8A
Results
Less than $477,330 est. value
Palm Beach Gardens, FL 33410

Raw Watermain Improvements for Surficial Aquifer (SA) Wells 8A-12A and Site Demolition for SA Wells 6-12 (W1817B)
Bidding
Jupiter, FL 33458

Well Drilling and Repair Services
Term Contract
Post-Bid
FL

Deep Injection Well Monitoring Well MW-1 Replace
Results
West Palm Beach, FL

Water Treatment Plant No. 2 Treatment and Disposal Improvements Design Package 2 - Deep Injection Well
Post-Bid
FL

General Injection Well Maintenance and Testing Services
Term Contract
Results
West Palm Beach, FL 33412

Upper Floridan Aquifer (UFA) Well Rehabilitation
Post-Bid
$1,800,000 est. value
Belle Glade, FL 33430

Construction Moss Pilot Project
Results
West Palm Beach, FL

System-Wide Wellfield Improvements - Phase 1
Results
Less than $12,104,730 est. value
Boca Raton, Delray Beach, FL

Water Treatment Plant Class I Injection Well System Mechanical Integrity Testing
Results
Less than $70,000 est. value
Wellington, FL 33414

Last Updated 01/19/2021 11:09 AM
Project Title

Construction of Surficial Aquifer Well 12A and Surficial Wellfield Rehabilitation Program (W2111)

Physical Address View project details and contacts
City, State (County) Jupiter, FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all permits, labor, equipment and materials necessary to perform well maintenance, rehabilitation and/or replacement of Surficial Aquifer production wells for the Town of Jupiter, located in Jupiter, Florida. Well maintenance activities may include but are not limited to removal/reinstallation of wellhead including downhole equipment and well piping; pump and motor inspection, repair and/or replacement of well mechanical components including miscellaneous welding, well disinfection and bacteriological clearance. Well rehabilitation activities may include but are not limited to removal/reinstallation of wellhead components, static and dynamic downhole well video, brushing existing well casing, clean-out open hole, chemical treatment of wells, removal/replacement of gravel pack, well development including air lift development, high velocity jetting with simultaneous air lift development and pump development, well performance pump testing, well disinfection and bacteriological clearance, site restoration, and completion of all required work to the extent the well facility has been successfully rehabilitated, returned to service and accepted by the OWNER based on the intent of the contract documents. Well replacement activities may include but are not limited to abandonment of an existing well and replacement with a well approximately 160’ deep with the top 120’ being 20" PVC casing and bottom 40’ being either 12” open hole, open hole with liner or 12” stainless steel screen including well construction permitting, drill site preparation, pilot hole construction and logging, well drilling and construction, well development, step rate pump testing, video logging, well disinfection and testing, well site restoration and all other incidentals as outlined

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents