Similar Projects
32nd Street and M Avenue Intersection Improvements
Infrastructure
Post-Bid
Anacortes, WA 98221

Darrington Wood Innovation Center
Infrastructure
Post-Bid
$9,650,000 est. value
Darrington, WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

SR 20 Skagit River Fish Passage
Infrastructure
Results
$4,000,000 to $4,500,000 est. value
WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

WA NPS PP NOCA 2020(1) Pavement Preservation North Cascades
Infrastructure
Results
Sedro Woolley, WA

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Post-Bid
$210,000 est. value

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

2022 Overlay Project
Infrastructure
Post-Bid
$600,000 est. value
Lenexa, Overland Park, Shawnee, KS - Burlington, WA 66216

Terminal Apron Reconstruction and Overlay Phase 1
Infrastructure
Results
$7,000,000 to $7,500,000 est. value
Burlington, WA 98233

Darrington Ranger District Road Maintenance
Infrastructure
Post-Bid
Marblemount, WA

SR 20, Rocky Creek to Granite Creek
Infrastructure
Results

2022 Pavement Improvements Project
Infrastructure
Post-Bid
$325,000 to $375,000 est. value
Sedro-Woolley, WA

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

2022 Overlay Project
Infrastructure
Results
$350,000 est. value
Concrete, WA

Last Updated 06/29/2022 06:54 AM
Project Title

2022 Overlay Project

Physical Address View project details and contacts
City, State (County) Lyman, WA   (Skagit County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $170,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed improvements include ACP Saw-cut, Roadway excavation, Planning Bituminous Pavement, HMA Pavement Repair, HMA Overlay, Project Temporary Traffic Control, Paint Stripe, and other work, all in accordance with the Contract Plans, Contract Provisions, and the Standard Specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents