Similar Projects
Clarkston 2016 Bond Projects - Bid Package 9
Post-Bid
Clarkston, MI

Anderson Middle School Cafeteria Addition
Addition
Post-Bid
Berkley, MI 48072

Van Hoosen Middle School Renovations 2020
Renovation
Results
Rochester, MI 48306

Reuther Middle School Renovations 2020
Renovation
Results
Rochester, MI 48307

Novi Middle School Secure Entry and Music Wing Addition
Addition
Post-Bid
Novi, MI 48374

Oxford Community Schools 2017 Bond, Series 2
Build-Out
Results
Oxford, MI

2019 Bond Projects - Bid Package 4
Post-Bid
West Bloomfield, Wixom, MI 48323

2019 Bond Projects - Bid Package 1
Results
Walled Lake, MI

Bid Package 4 - Elementary Schools Additions and Remodeling, Concessions, HS Pool HVAC's, and MHS Parking lot and Upgrades
Renovation, Addition
Post-Bid
MI 48357

Oxford Community Schools Series 2 Bid Pack 4
Results
Oxford, MI

Oxford Community Schools 2017 Bond, Series 3
Post-Bid
Oxford, MI

Interior Renovations at West Bloomfield High School
Renovation
Results
Less than $1,070,000 est. value
West Bloomfield, MI

West Bloomfield High School, Phase 3 - Bid Package No.5
Post-Bid
West Bloomfield, MI 48323

Summer 2020 Renovation Projects
Renovation
Results
Ferndale, MI 48237

Bid Package 1 East Middle School Remodeling Project
Renovation
Post-Bid
Farmington Hills, MI 48336

Last Updated 08/26/2021 07:23 AM
Project Title

Brother Rice High School - Locker Room & Academics Renovations - Phase 1B

Physical Address View project details and contacts
City, State (County) Bloomfield Hills, MI 48301   (Oakland County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Complete as of August 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovations include: Computer Lab: 2100 Sq Ft, Office Area: 4750 Sq Ft, Academic Area: 8700 Sq FT, and Locker Room: 4000 Sq Ft

Details

Middle/Senior High School, 19,550 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties.
Division 11 - Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 28 - Electronic Safety and Security, Access Control, Access Control Interfaces, Access Control Interfaces to Fire Alarm.
Division 31 - Earthwork.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents