Similar Projects
West Winds Condominium (Stony Brook Phase III)
New Construction, Infrastructure
Design
$51,000,000 CJ est. value
Fenton, MI 48430

West Winds Condominium (Stony Brook Phase III)
New Construction, Infrastructure
Design
$51,000,000 CJ est. value
Fenton, MI 48430

Resurfacing of Two (2) Basketball Courts
Infrastructure
Bidding
$60,000 CJ est. value
Flint, MI 48505

2022 Deerfield Township Hall Renovation
Infrastructure, Renovation
Bidding
$2,000,000 CJ est. value
Linden, MI 48451

Street Sweeping Services
Term Contract
Post-Bid
Flint, MI

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

0.22 MI of Road Grade Correction including Hot Mix Asphalt Resurfacing, Drainage, Culvert, Sewer and Pavement Markings
Results
MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

I-475 From Thread Creek to Flint River Rebuild
Demolition, New Construction, Infrastructure
Pending Verification
$84,000,000 CJ est. value
Flint, MI 48505

I-475 From Thread Creek to Flint River Rebuild
Demolition, New Construction, Infrastructure
Pending Verification
$84,000,000 CJ est. value
Flint, MI 48505

Dowdall Elementary - 2022 Bond - Kearsley Community Schools
Addition, Alteration
Design
$1,000,000 est. value
Flint, MI 48506

Bridge Rehabilitation Including Structural Steel Repairs, Heat Straightening and Zone Painting on Hill Road Over US-23
Infrastructure
Bidding
$547,000 CJ est. value
Flint, MI 48532

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

19.56 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Full Depth Concrete Pavement Repairs, Joint Repairs and Pavement Markings
Results

Lahring Road and US-23 Multi Residential Development
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Fenton, MI 48430

Last Updated 08/24/2022 03:04 AM
Project Title

Hot Mix Asphalt Rehabilitation Including 4 to 3 Lane Reduction, Concrete Pavement Removal, Pavement Repairs, Concrete Curb and Gutter, Ramps, Signing and Pavement Markings

Physical Address View project details and contacts
City, State (County) Flint, MI 48504   (Genesee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,164,784 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

0.54 mi of hot mix asphalt rehabilitation including 4 to 3 lane reduction, concrete pavement removal, pavement repairs, concrete curb and gutter, ramps, signing and pavement markings on Flushing Road from Eldorado Drive to Ballanger Highway, Genesee County. This is a Local Agency project. Control Sec Job No Federal No STU 25000 207631A 22A0421 Net classification required for this project is 956 Cb or 956 Ea In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and J. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. MDOT - 2205 034 - Hot Mix Asphalt Rehabilitation Including 4 to 3 Lane Reduction, Concrete Pavement Removal, Pavement Repairs, Concrete Curb and Gutter, Ramps, Signing and Pavement Markings

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents