Similar Projects
Last Updated | 03/09/2023 04:04 PM |
Project Title | PVD Stormwater Conveyance System Improvements |
Physical Address | View project details and contacts |
City, State (County) | Warwick, RI 02886 (Kent County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Rhode Island Airport Corporation (RIAC) is seeking Requests for Qualifications (RFQ) from qualified aviation consulting firms with capabilities to perform design engineering, bid phase, construction phase, and environmental services to develop design drawings, specifications, construction cost estimates, perform general administration and produce final bid documents associated with the PVD Stormwater Conveyance System Improvements project. At Rhode Island T. F. Green International Airport (PVD), the outfalls for the airport's stormwater catchment areas 2, 3, and 8 experience steady dry weather flows, indicating the presence of groundwater infiltration. These catchment areas collect stormwater from the airfield and drain to tributaries of Buckeye Brook which is an impaired water body. Among the impairments is iron, which is known to be present in the groundwater in the Warwick area. RIAC therefore seeks to get ahead of potential outfall permit requirements by implementing measures to reduce dry weather flow at outfalls 2, 3, and 8 at PVD. DBE participation goal is 9.56% Deadline for Questions January 27, 2023 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |