Similar Projects
Incidental Mechanical Repairs
Term Contract
Post-Bid
Johnstown, PA 15907

Replacement of Boilers and Domestic Hot Water Heaters
Post-Bid
Scranton, PA 18509

Harris Township Maintenance Facility - Mechanical
Results
Less than $175,400 est. value
Boalsburg, PA 16827

Security Vestibules for Commodore Perry Schools (Mechanical Construction)
Results
Hadley, PA 16430

35DEP Mechanical Maintenance Services
Post-Bid
Harrisburg, PA

Wastewater Treatment Plant Phase II - Mechanical Construction
Results
$100,000 to $125,000 est. value
Greencastle, PA 17225

Electrical Services HVAC/Mechanical Services - Residential HVAC/Mechanical Services - Commercial Plumbing Services
Term Contract
Post-Bid
York, PA 17405

H346--Chiller Chemical Treatment Wilkes Barre VAMC
Results
Wilkes-Barre, PA 18711

Maintenance of Various Kitchen, Refrigeration, Laundry, Boiler, Hot Water and HVAC Equipment
Term Contract
Post-Bid
Pittsburgh, PA 15207

Wastewater Treatment Plant Improvements - Mechanical
Results
$120,000 est. value
Camp Hill, PA 17011

Penn Trafford High School - Mechanical Pipe Remediation
Post-Bid
Harrison City, PA 15636

Municipal Campus Improvements Project - Mechanical Construction
Results
Less than $570,000 est. value
Dallastown, PA 17313

Kelly Township Building Addition - Mechanical Construction
Post-Bid
Lewisburg, PA 17837

Monaca WWTP Secondary Clarifier Mechanical Replacement
Results
Less than $583,000 est. value
Monaca, PA 15061

Philadelphia Zoo Animal Hospital - Mechanical Equipment Replacement
Post-Bid
Philadelphia, PA 19104

Last Updated 03/15/2022 11:46 PM
Project Title

College Wide Building Ventilation Phase 3 - Mechanical

Physical Address View project details and contacts
City, State (County) Blue Bell, PA 19422   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will take place in four separate buildings at Blue Bell Campus. 1. Facilities Maintenance Building: a. Addition of bipolar ionization devices to the (1) air handler serving the building. BPI devices will be placed in the supply air ductwork. 2. East House a. Addition of bipolar ionization devices to the (1) rooftop unit and (3) air handlers. BPI devices will be placed in the supply air ductwork. 3. Fine Arts Center a. Addition of bipolar ionization devices to the (15) air handlers serving the building. BPI devices will be placed in the supply air ductwork. 4. Veteran’s Center a. Addition of bipolar ionization devices to system. BPI devices will be placed in the supply air ductwork. b. Addition of split DX air handler with energy recovery. c. Electrical upgrades to accommodate air handler, condenser, BPI devices and energy recovery unit as required.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents