Similar Projects
Last Updated | 08/07/2023 05:05 PM |
Project Title | Rehabilitate Campgrounds |
Physical Address | View project details and contacts |
City, State (County) | Bedford, VA 24523 (Bedford County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The National Park Service (NPS), Blue Ridge Parkway, is issuing combined sol/synopsis for rehabilitating accessible campground sites to meet Architectural Barriers Act (ABA) guidelines and non-accessible campground sites in the Otter Creek Campground (Milepost 60.8) and the Peaks of Otter Campground (Milepost 85.6) located in Bedford VA. The work of this project involves removing existing campground site amenities, demolishing existing asphalt/concrete, regrading campground sites, placing new concrete surface at accessible campground sites and on accessible paths and walks, and installing new campground site amenities. The contractor will purchase the appropriate concrete tables and fire rings that meet the specifications, and the contractor will fabricate appropriate wood seats for the concrete picnic tables. TYPE OF CONTRACT: Firm Fixed Price 100% small business set-aside procurement. The NAICS code is 238990 All other Specialty Trade Contractors and the size standard is $16.5 million. In accordance with FAR Subpart 36.204, the magnitude of this requirement is estimated between $250,000 to $500,000. Period of Performance 9/1/2023 - 4/30/2024 SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at https://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Interested Offerors are encouraged to ensure that they are registered in SAM prior to submitting their quote. THESE REGISTRATIONS WILL BE COMPLETED BEFORE TIME OF AWARD. Pre-proposal Conference/Site Visit: All interested contractors are encouraged to attend site visit scheduled for Monday July 24th, 2023 at 11am at the Peaks of Otter Campground and 1pm at Otter Creek Campground (Starting at Peaks of Otter and Finishing at Otter Creek). Please send email confirming attendance to Ashley_Warcewicz@nps.gov Vendor Questions cut-off date: July 26, 2023, 5:00 EST send via-email to Ashley_Warcewicz@nps.gov Request for quotes closes August 4, 2023, 5:00PM EST send via-email all quotes to Ashley_Warcewicz@nps.gov The contracting office will not provide hardcopies or email copies of solicitation. No Phone calls, please. This is currently an unfunded requirement with a high expectation that funds will be available. When and if funds become available a contract will be awarded at that time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |