Similar Projects
Mold Removal and Remediation at Austin State Supported Living Center
Demolition
Post-Bid
Less than $382,328 est. value
Austin, TX 78756

Photovoltaic Power Systems and Component
Term Contract
Post-Bid
Austin, TX 78759

Austin, TX ATCT DCD/HVAC Replacement
Results
$1,000,000 to $5,000,000 est. value
Austin, TX 78719

Fire Alarms, Sprinklers and Fire Extinguishers
Results
Pflugerville, TX 78660

Sprinkler System Work
Post-Bid
Pflugerville, TX 78660

Generator Hydrogen Fast Purge Systems, Sand Hill
Results
Del Valle, TX 78617

Campus Switch Upgrades
Post-Bid
Austin, TX 78703

Substation Control Switches and Lock-Out Relays
Results
Less than $3,500,000 est. value
Austin, TX 78767

Fire/Security Alarm Access Control Equipment
Post-Bid
Austin, TX 73301

Air Filter Changing Services
Results
Less than $122,790 est. value
Austin, TX 78711

Steiner Elementary HVAC Update
Post-Bid
Austin, TX 78732

Fire Protection Services
Results
Less than $2,500,000 est. value
Austin, Bastrop, Buchanan Dam, Horseshoe Bay, La Grange, Marble Falls, Matagorda, Smithville, TX 78703

HVAC and Roof Replacement Project
Term Contract
Post-Bid
Austin, TX 78746

Install Fire Alarm System
Results
$200,000 to $300,000 est. value
Austin, TX 78722

District UPS Replacement
Post-Bid
Pflugerville, TX 78660

Last Updated 12/12/2019 07:49 AM
Project Title

Electrical, Fire Alarm and HVAC Upgrades at Covington MS

Physical Address View project details and contacts
City, State (County) Austin, TX 78703   (Travis County)
Category(s) Single Trades
Sub-Category(s) Electric, Fire Protection, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. HVAC: Replace existing heat pump units on the first floor as indicated on the plans. Integrate new HVAC units into existing building Automation System. 2. Electrical: Replace 480v/280v 3 phase distribution switch boards including a main switchboard. 3. Replace Ceiling Grid in the hallways (first and second floor) and replace existing fixtures with new LED light fixtures. Replace outdoor canopy lights with LED fixtures. 4. Plumbing: Replace 2 hot water heaters and 1 hot water boiler and associated recirculation pumps.

Details

Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents