Similar Projects
Sandy Boulevard Mixed-Use Development / Portland
New Construction - 16,139 SF
Conception
$57,000,000 est. value
Portland, OR 97232

Sandy Boulevard Mixed-Use Development / Portland
New Construction - 16,139 SF
Conception
$57,000,000 est. value
Portland, OR 97232

The Welby
New Construction
Design
Portland, OR 97209

The Welby
New Construction
Design
Portland, OR 97209

2022 Signals Superbundle Rebid
Infrastructure
Bidding
$3,403,120 CJ est. value
Portland, OR 97204

Arbor Lodge Family Shelter Renovations
LEED Certification, Renovation
Bidding
$7,100,000 CJ est. value
Portland, OR 97217

Washington Park Reservoir Improvements Bid Package 3 - Reflecting Pool Plumbing, Hardscape and Signage
Renovation, Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Portland, OR 97204

Dpt Drilling Services In Portland
Infrastructure
Post-Bid
Portland, OR

Rockwood Sunrise Site
Renovation
Post-Bid
Gresham, Portland, OR 97233

Latourell Creek Bridge
New Construction, Infrastructure
Results
$950,000 to $1,050,000 est. value
Corbett, OR 97019

I-84: Corbett Interchange-Multnomah Falls Section of the Columbia River Highway (Rt. No. I-84)
Infrastructure
Results
$100,000 to $500,000 est. value
Corbett, OR

Walmart Supercenter #2552-240 - Entertainment Optimization
Renovation - 15,173 SF
Construction
Portland, OR 97266

Albertina Kerr Workforce and Inclusive Housing
New Construction
Construction
Gresham, OR 97230

N Mobile Ave Apartment Building
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Portland, OR 97217

N Mobile Ave Apartment Building
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Portland, OR 97217

Last Updated 09/14/2022 04:07 PM
Project Title

Riverplace Phase I

Physical Address View project details and contacts
City, State (County) Portland, OR 97201   (Multnomah County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Hotel/Motel, Office, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $124,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: a 30-story, multi-family high-rise development with 329 dwelling units As of September 2022, A general contractor has been selected. Construction is expected to begin in the second quarter of 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

30 Stories Above Grade, 400,000 SF Apartments, 329 Unit(s).
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents