Similar Projects
Winters Mill Parkway
Bidding
Wimberley, TX 78676

RM 3237 Roundabout
Bidding
San Marcos, TX

Chaparral Park Road at Little Bear Creek
Post-Bid
San Marcos, TX 78666

Barton Creek Contract 1 and Contract 2
Post-Bid
San Marcos, TX 78666

Southern Region Disaster Recovery Support BPA
Results

Windy Hill Project Grant Administrator
Results
Less than $2,900,000 est. value
Kyle, TX 78640

Kissing Tree Phase 4B, Section 1
Post-Bid
San Marcos, TX 78666

Trails at Windy Hill Phase 2
Results
TX

Parten Ranch, Phase 5 Paving, Drainage, Water and Wastewater Improvements
Post-Bid
Dripping Springs, TX 78620

Overlay
Results
Less than $2,399,195 est. value
TX

Sunfield Phase 3 Section 3-5C Paving Improvements
Post-Bid
Buda, TX

South Guadalupe Street Improvements
Results
Less than $1,152,587 est. value
San Marcos, TX 78666

Sunfield Phase 3 Section 3-6A Paving Improvements
Post-Bid
Buda, TX

Construct Two Lanes and Shoulders
Results
Less than $17,874,783 est. value
TX

Sunfield Phase 3 Section 3-6B Paving Improvements
Post-Bid
Buda, TX

Last Updated 04/27/2021 04:53 AM
Project Title

Construct New Roadway Lanes

Physical Address View project details and contacts
City, State (County) TX   (Hays County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,726,565
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 52.000 1 104 6010 Removing Conc (Riprap) Cy 10.000 2 106 6002 Obliterating Abandoned Road Sy 2,896.000 3 110 6001 Excavation (Roadway) Cy 27,486.000 4 132 6003 Embankment (Final)(Ord Comp)(Ty b) Cy 15,039.000 5 160 6003 Furnishing And Placing Topsoil (4") Sy 39,616.000 6 164 6009 Broadcast Seed (Temp) (Warm) Sy 19,810.000 7 164 6011 Broadcast Seed (Temp) (Cool) Sy 19,810.000 8 164 6021 Cell Fbr Mlch Seed(Perm)(Rural)(Sandy) Sy 39,616.000 9 168 6001 Vegetative Watering Mg 667.000 10 169 6006 Soil Retention Blankets (Cl 2) (Ty f) Sy 2,280.000 11 247 6366 Fl Bs (Cmp In Plc)(Ty a Gr 5)(Fnal Pos) Cy 11,070.000 12 260 6027 Lime Trt (Exst Matl)(8") Sy 39,088.000 13 260 6043 Lime (Hyd, Com Or Qk)(Slurry) Ton 705.000 14 310 6001 Prime Coat (Multi Option) Gal 7,817.000 15 340 6138 d-Gr Hma(Sq) Ty-d Pg76-22 Ton 2,449.000 16 340 6272 Tack Coat Gal 2,376.000 17 347 6001 Tom (Asphalt) Pg 76-22 Ton 111.000 18 347 6006 Tom - c (Aggregate) Sac - b Ton 1,673.000 19 347 6008 Tack Coat Gal 2,378.000 20 402 6001 Trench Excavation Protection Lf 1,712.000 21 403 6001 Temporary Spl Shoring Sf 11,322.000 22 416 6029 Drill Shaft (Rdwy Ill Pole) (30 In) Lf 220.000 23 420 6054 Cl c Conc (Headwall) Cy 6.600 24 423 6001 Retaining Wall (Mse) Sf 16,553.000 25 432 6001 Riprap (Conc)(4 In) Cy 24.000 26 432 6022 Riprap (Stone Common)(Dry)(6 In) Cy 411.000 27 432 6044 Riprap (Conc)(Flume) Cy 81.000 28 432 6045 Riprap (Mow Strip)(4 In) Cy 40.000 29 450 6032 Rail (Ty c223) Lf 1,583.000 30 450 6052 Rail (Handrail)(Ty f) Lf 378.000 31 462 6003 Conc Box Culv (4 Ft x 2 Ft) Lf 316.000 32 462 6014 Conc Box Culv (7 Ft x 3 Ft) Lf 237.000 33 464 6003 Rc Pipe (Cl Iii)(18 In) Lf 1,749.000 34 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 859.000 35 464 6007 Rc Pipe (Cl Iii)(30 In) Lf 519.000 36 464 6027 Rc Pipe (Cl v)(36 In) Lf 93.000 37 465 6016 Inlet (Compl)(Pco)(3ft)(Both) Ea 31.000 38 465 6020 Inlet (Compl)(Pco)(4ft)(Both) Ea 3.000 39 465 6032 Inlet (Compl)(Pcu)(3ft)(Both) Ea 1.000 40 465 6128 Inlet (Compl)(Psl)(Fg)(4ftx4ft-4ftx4ft) Ea 2.000 41 465 6130 Inlet (Compl)(Psl)(Fg)(3ftx5ft-3ftx5ft) Ea 1.000 42 466 6151 Wingwall (Fw - 0) (Hw=4 Ft) Ea 1.000 43 466 6165 Wingwall (Fw - s) (Hw=4 Ft) Ea 1.000 44 466 6183 Wingwall (Pw - 1) (Hw=8 Ft) Ea 1.000 45 479 6001 Adjusting Manholes Ea 1.000 46 496 6004 Remov Str (Set) Ea 2.000 47 496 6007 Remov Str (Pipe) Lf 127.000 48 500 6001 Mobilization Ls 1.000 49 502 6001 Barricades, Signs And Traffic Handling Mo 16.000 50 506 6002 Rock Filter Dams (Install) (Ty 2) Lf 360.000 51 506 6011 Rock Filter Dams (Remove) Lf 360.000 52 506 6020 Construction Exits (Install) (Ty 1) Sy 200.000 53 506 6024 Construction Exits (Remove) Sy 200.000 54 506 6038 Temp Sedmt Cont Fence (Install) Lf 9,267.000 55 506 6039 Temp Sedmt Cont Fence (Remove) Lf 9,267.000 56 506 6040 Biodeg Erosn Cont Logs (Instl) (8") Lf 980.000 57 506 6041 Biodeg Erosn Cont Logs (Instl) (12") Lf 210.000 58 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 1,190.000 59 508 6001 Constructing Detours Sy 750.000 60 512 6104 Pctb Fur&Instl(f-Shape Or Sngl Slp)Ty1 Lf 960.000 61 512 6106 Port Ctb Remove(f-Shape Or Sngl Slp)Ty1 Lf 960.000 62 528 6008 Colored Textured Conc (5") Sy 330.000 63 529 6008 Conc Curb & Gutter (Ty Ii) Lf 16,354.000 64 529 6038 Conc Curb (Ribbon) Lf 134.000 65 530 6005 Driveways (Acp) Sy 1,419.000 66 531 6002 Conc Sidewalks (5") Sy 7,983.000 67 531 6004 Curb Ramps (Ty 1) Ea 2.000 68 531 6013 Curb Ramps (Ty 10) Ea 3.000 69 540 6001 Mtl w-Beam Gd Fen (Tim Post) Lf 75.000 70 542 6001 Remove Metal Beam Guard Fence Lf 141.000 71 542 6002 Remove Terminal Anchor Section Ea 3.000 72 544 6001 Guardrail End Treatment (Install) Ea 1.000 73 545 6005 Crash Cush Atten (Remove) Ea 2.000 74 545 6019 Crash Cush Atten (Instl)(s)(n)(Tl3) Ea 2.000 75 550 6008 Chain Link Fence (Install) (8') Lf 200.000 76 550 6015 Remove And Install Existing Gate Ea 2.000 77 610 6161 In Rd Il (Ty Sa) 30t-4-4 (250w Eq) Led Ea 16.000 78 610 6290 In Rd Il (Ty Sa) 50t-12 (400w Eq) Led Ea 6.000 79 618 6023 Condt (Pvc) (Sch 40) (2") Lf 4,419.000 80 620 6008 Elec Condr (No.8) Insulated Lf 14,349.000 81 624 6002 Ground Box Ty a (122311)w/Apron Ea 4.000 82 628 6049 Elc Srv Ty a 240/480 060(Ns)Ss(t)Sp(o) Ea 1.000 83 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(p) Ea 22.000 84 644 6007 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(u) Ea 1.000 85 644 6033 In Sm Rd Sn Sup&Am Tys80(1)Sa(u) Ea 2.000 86 644 6076 Remove Sm Rd Sn Sup&Am Ea 1.000 87 658 6047 Instl Om Assm (Om-2y)(Wc)Gnd Ea 6.000 88 662 6001 Wk Zn Pav Mrk Non-Remov (w)4"(Brk) Lf 584.000 89 662 6004 Wk Zn Pav Mrk Non-Remov (w)4"(Sld) Lf 5,192.000 90 662 6012 Wk Zn Pav Mrk Non-Remov (w)8"(Sld) Lf 452.000 91 662 6016 Wk Zn Pav Mrk Non-Remov (w)24"(Sld) Lf 24.000 92 662 6034 Wk Zn Pav Mrk Non-Remov (y)4"(Sld) Lf 8,046.000 93 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 792.000 94 666 6048 Refl Pav Mrk Ty i (w)24"(Sld)(100mil) Lf 97.000 95 666 6054 Refl Pav Mrk Ty i (w)(Arrow)(100mil) Ea 6.000 96 666 6078 Refl Pav Mrk Ty i (w)(Word)(100mil) Ea 6.000 97 666 6141 Refl Pav Mrk Ty i (y)12"(Sld)(100mil) Lf 700.000 98 666 6300 Re Pm w/Ret Req Ty i (w)4"(Brk)(100mil) Lf 1,716.000 99 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 9,046.000 100 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 3,670.000 101 672 6007 Refl Pav Mrkr Ty i-c Ea 19.000 102 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 280.000 103 672 6010 Refl Pav Mrkr Ty Ii-c-r Ea 122.000 104 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 1,535.000 105 730 6107 Full - Width Mowing Cyc 4.000 106 734 6002 Litter Removal Cyc 4.000 107 738 6003 Cleaning / Sweeping (Outside Main Lane) Cyc 4.000 108 3076 6001 d-Gr Hma Ty-b Pg64-22 Ton 6,940.000 109 3085 6001 Underseal Course Gal 60.000 110 6001 6002 Portable Changeable Message Sign Ea 3.000 111 6120 6001 Dead End Roadway Barricade Lf 32.000 112 6185 6002 Tma (Stationary) Day 237.000 113 6185 6005 Tma (Mobile Operation) Day 1.000 114

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents