Similar Projects
RFP Engineering - Compressed Air System Improvements at Jones Island Water Reclamation Facility
Renovation, Infrastructure
Conception
$1,400,000 CJ est. value
Milwaukee, WI 53207

RFP Engineering - Martha Washington / Highlands Area Miscellaneous Improvements
Infrastructure
Conception
$4,496,759 CJ est. value
Milwaukee, WI 53202

Repaving at Locust Court
Infrastructure - 1,308 SF
Design
$300,000 CJ est. value
Milwaukee, WI 53212

South Kinnickinnic Avenue Resurfacing - City of Saint Francis
Alteration
Design
$328,925 est. value
Saint Francis, WI

RFP Engineering - Perpetuation - Resurfacing Howell Ave
Infrastructure
Bidding
$10,999,999 CJ est. value
Milwaukee, WI 53202

RFP Engineering - Perpetuation - Resurfacing Ryan Road
Infrastructure
Bidding
$10,999,999 CJ est. value
Milwaukee, WI 53202

Michigan Street Commons Multi-Family
New Construction, Infrastructure
Sub-Bidding
$14,000,000 CJ est. value
Milwaukee, WI 53233

Public Construction Phase 4 Street Lighting at Westlawn Gardens Phase 2
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Milwaukee, WI 53218

DPW Sewer and Water Mains
Post-Bid
Milwaukee, WI 53288

2021 Water Main Relay Project
Post-Bid
Brown Deer, WI

2021 Watermain Replacement
Results
Glendale, WI

Lead Service Line Replacements
Results
Milwaukee, WI

Milwaukee Public Library and Multi-Residential Phase 2
Demolition, New Construction, Infrastructure - 18,400 SF
Pending Verification
$21,500,000 CJ est. value
Milwaukee, WI 53212

One Catalano Square
Demolition, New Construction, Infrastructure - 168,000 SF
Pending Verification
$30,000,000 CJ est. value
Milwaukee, WI 53202

Medical College of Wisconsin Cancer Research Facility
New Construction, Infrastructure - 150,000 SF
Design
$100,000,000 CJ est. value
Wauwatosa, WI 53226

Last Updated 08/02/2022 02:04 PM
Project Title

Foundation Drain Disconnection Project

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53202   (Milwaukee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $649,720 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Foundation Drain Disconnection Project Located at: Area Bounded By: W. Harrison Ave. To W. Kinnickinnic River Pkwy. and S. 60 th St. to S. 72 nd St. Time for Completion: All foundation drain disconnection and sump pump installation work shall be completed by 3/31/2023. All work shall be continuous and the number of allowable working days shall be 160. All photo and video documentation as described in the "Project Details" Section of this contract specification shall be submitted to the Construction Engineer by 4/26/2023. Only Contractors that have been prequalified through MMSD's Private Property Infiltration and Inflow Reduction Municipal Contractors' procurement process are allowed to bid on this work. A copy of the executed Memorandum of Understanding (MOU) between the contractor and MMSD must be provided to the City prior to the bid results being accepted by the City. This contract will include the terms set forth in the MOU and in the City / MMSD - funding agreement M10005MI03. A copy of the funding agreement is included in this bid package. Please note that the prime contractor must be the contractor that performs the majority of the work unless approved by the City prior to bid Liquidated Damages, per diem: $250 Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. THE EMAILED COPY OF THE BOND MUST BE RECEIVED BY NO LATER THAN 10:30 A.M. ON THE SAME DATE THAT THE BIDS ARE DUE FOR THAT SPECIFIC OFFICIAL NOTICE, or the bid will be considered non-responsive. The original bid bond document must then be submitted by the contractor to the Department of Public Works Contract Office inperson or by mail to 841 N Broadway, Rm. 506, Milwaukee, WI 53202, immediately upon being notified that they are the apparent low bidder. All Contractors awarded a contract valued at $25,000.00 or more are required to participate in training on the City of Milwaukee's B2GNow contract compliance software within 30 days of the contract award date. Throughout the contract term, Contractors are required to regularly provide timely subcontractor payment information in the City's contract compliance software. Please contact the Office of Equity and Inclusion (OEI) at 414-286-5553 should you have any questions or concerns regarding the training or reporting process. The Prime Contractor awarded this project is required to participate in training on the City of Milwaukee's LCP Tracker Labor Compliance Software after the date of contract award. Throughout the contract term, Contractors are required to regularly provide timely payroll information via LCP Tracker. Please contact the DPW Contracts Office at 414-286- 3314 should you have any questions or concerns regarding the training or reporting process.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents