Similar Projects
Grading, Interim Surfacing, Replace Str RCBC, Approach Slab
Demolition, New Construction, Infrastructure
Conception
$19,242,000 CJ est. value
Toronto, SD 57268

Grading, Interim Surfacing, Replace Str RCBC, Approach Slab
Demolition, New Construction, Infrastructure
Conception
$19,242,000 CJ est. value
Toronto, SD 57268

Cold Milling Asphalt Concrete Asphalt Concrete Resurfacing 26K Ton, Pipe Work, Modify Intersection
Infrastructure
Post-Bid
SD

Rout and Seal
Infrastructure
Results

AC Resurface Murdo Maintenance Yard, Chip Seal, and Fog Seal
Infrastructure
Results
$5,000,000 est. value
Clear Lake, SD

AC Surfacing - SD 15
Infrastructure
Conception
$6,533,000 CJ est. value
Clear Lake, SD 57226

Saw Cutting Relief Joints in Pavement
Infrastructure
Results
$5,000,000 est. value
Clear Lake, SD

AC Surfacing, Mill, AC Resurfacing - SD 28
Infrastructure
Conception
$11,390,000 CJ est. value
Toronto, SD 57268

Asphalt Concrete Overlay
Infrastructure
Results
$999,000 est. value
Clear Lake, SD

Urban Grading, AC Surfacing, Curb and Gutter, Sidewalk, Lighting - SD 28
Infrastructure
Conception
$3,804,000 CJ est. value
Toronto, SD 57268

Deuel County Highway 312 Asphalt Concrete Overlay
Infrastructure
Results
$1,572,227 CJ est. value
Clear Lake, SD 57226

Rout and Seal - Aberdeen Area
Infrastructure
Results
$198,922 CJ est. value
Clear Lake, SD 57226

Last Updated 02/17/2024 10:01 AM
Project Title

Grading, Structure (9x9 CIP or Precast RCBC) and Interim Surfacing

Physical Address View project details and contacts
City, State (County) Clear Lake, SD 57226   (Deuel County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $23,225,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County: Deuel SWPPP = 195.00 AC Contract Id: 9306 Grading, Structure (9x9 CIP or Precast RCBC) & Interim Surfacing SD15 - Fm SD28 N to Clear Lake Work Type 1 Length miles 11.392 Prime Contractors must be prequalified in the work type specified for any bid $250,000 or greater. Contractors may submit questions to the forum until 10:00 am CT on 2/22/2024. Questions and answers may be posted until 10:00 am CT on 2/26/2024 at which time the forum will be closed. All bids will be checked for qualifications with results posted on the SDDOT website. The Department of Transportation reserves the right to reject any or all bids. SDDOT - Item no 003 - Grading, Structure (9x9 CIP or Precast RCBC) and Interim Surfacing

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents