Similar Projects
Construction of Grand Mission Regional Detention System Maintenance
Post-Bid
$600,000 est. value
TX

Dry Creek Regional Detention Pond Phase 2
Post-Bid
$844,430 est. value
Rosenberg, TX

Construction of Long Meadow Farms Section 46, Phase 1A Water, Sewer, and Drainage Improvements
Results
TX

Water, Sanitary Sewer, and Drainage Facilities, Paving and Appurtenances to Serve Mustang Trails Section 3
Results
Less than $1,636,000 est. value
TX

Water, Sanitary, and Drainage Facilities in Grand Mission Estates Section 26, Section 27, Lift Station No. 2, and Force Main
Post-Bid
$1,700,000 est. value
TX

Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Twinwood Estate Entrance
Results
TX

Extended Day Suites and SPED Renovations
Renovation - 48,143 SF
Post-Bid
Less than $8,526,726 est. value
TX

Construction of the Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Southern Colony Section 5
Results
Less than $278,500 est. value
TX

Section 17-18 for Jordan Ranch
Post-Bid
Fulshear, TX 77441

Deer Run Meadows Detention Pond
Results
Less than $1,719,602 est. value
TX

Site 1 Lea Street Drainage and Site 2 Penn Drainage Improvements
Post-Bid
Fulshear, TX 77441

Water, Sanitary and Drainage Facilities in Creekside Ranch Section 11
Results
TX

Construction of Water, Sanitary Sewer, and Drainage Facilities for Sunset Crossing Section 3
Post-Bid
$1,000,000 to $1,200,000 est. value
TX

Water, Sanitary and Drainage Facilities in Shipmans Cove Boulevard
Results
Missouri City, TX

Water, Sanitary Sewer, and Drainage Facilities for Sunset Crossing Bryan Road Phase III
Post-Bid
TX

Last Updated 05/15/2020 07:37 AM
Project Title

Water, Sanitary, Drainage and Paving Facilities for Harvest Green Section 25B

Physical Address View project details and contacts
City, State (County) TX   (Fort Bend County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,579,920
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is within the Harvest Green subdivision in Fort Bend County. It is within the boundaries of Fort Bend County M.U.D. No. 134E and is in the City of Richmond ETJ. It is located west of Harlem Road approximately 0.19 mile north its intersection with Plantation Drive, then continue west on Harvest Home Drive approximately 0.51 miles, and then continue southwest onto Country Fields Drive to proposed site. The project is located in Fort Bend County, Key Map 566-K and 566-L.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents