Similar Projects
Pavement Improvements
Infrastructure
Bidding
$5,000,000 CJ est. value
Cassville, MO 65625

Pavement Improvements
Infrastructure
Bidding
$5,000,000 CJ est. value
Cassville, MO 65625

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Asphalt and Concrete Work
Infrastructure
Post-Bid
Purdy, MO

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

Resurface in Roaring River State Park
Infrastructure
Results
$500,000 to $750,000 est. value
MO

Asphalt Overlay
Infrastructure
Post-Bid
Monett, MO

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

Road Maintenance
Term Contract
Post-Bid
Purdy, MO

2022 Street Resurfacing
Infrastructure
Results
Cassville, MO

2022 Backhoe Work, Hauling, Mowing, Road Signs, Signposts, Concrete, Culverts, Chip and Seal, Cold and Hot Mix Asphalt, Slurry Seal Application, Gravel and Patch or Spot Chip
Term Contract, Infrastructure
Post-Bid
Purdy, MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Site Excavation
Infrastructure
Post-Bid
$100,000 est. value
Wheaton, MO

1.3 miles of Double Chip and Seal
Infrastructure
Post-Bid
$370,000 est. value
Verona, MO 65769

Last Updated 11/16/2022 01:36 AM
Project Title

Resurface

Physical Address View project details and contacts
City, State (County) Cassville, MO 65625   (Barry County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $699,888 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J1P3318 Route 36 LIVINGSTON County. Resurface from bridge over Coon Creek (Livingston County) to the Caldwell County line, the total length of improvement being 9.449 miles. (1): Job J7S3431 Route H BARRY County. Resurface from Route 86 to the Arkansas State line, the total length of improvement being 0.262 miles. (2): Job J7S3432 Route P BARRY County. Resurface from Rte. 86 to the Arkansas State line, the total length of improvement being 1.003 miles. (3): Job J7S3436 Route YY BARRY County. Resurface from Route 39 to Big Bay Road, the total length of improvement being 2.751 miles. FEDERAL PROJECT NUMBER(S): FAS S604(3),(4),(6) Range: 500K to 750K Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - G03 - Resurface *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions concerning this project during the bidding process shall be forwarded to the project contact listed below. Drew Bowman, P.E. Transportation Project Manager Missouri Department of Transportation Southwest District - Project Delivery 3025 East Kearney St., Springfield, MO 65803 e: andrew.bowman@modot.mo.gov c: 417.292.1742 All questions concerning the bid document preparation can be directed to the Central Office-Design at (573)751-2876.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents