Similar Projects
Reported | 12/17/2020 12:00 AM |
Project Title | Mercedes Force Main Improvements Phase II - Line Replacement |
Physical Address | View project details and contacts |
City, State (County) | Tuscaloosa, AL (Tuscaloosa County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The replacement of a portion of the sanitary sewer force main that runs to the Mercedes-Benz Plant, in the vicinity of Ed Stephens Rd. Removal and replacement of approximately 3,600 LF of 16” ductile iron sanitary sewer force main with 24” HDPE sanitary sewer force main; installation of a 12” HDPE temporary sanitary sewer force main; 12” HDPE and 24” HDPE directional bores; replacement of 3 air and vacuum release valves; two 24” gate valves; two 16” insertion valves; two 16” X 12” tapping sleeves and valves and all other items required to complete the job as listed in the Bid Schedule |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |