Similar Projects
Construction of Rawson Hill Dam Rehabilitation Project - Worcester County, Massachusetts
New Construction
Design
$1,000,000 to $5,000,000 est. value
MA

Amelia Earhart Dam Facility Hardening Upgrade
Renovation
Bidding
$4,900,000 est. value
Somerville, MA 02145

Dam, Levee and Seawall Repair and Removal Grant - Construction
Renovation
Bidding
Boston, MA

Spring Street Tide Gate Replacement
Post-Bid
Everett, MA 02149

Muzzy Dam Flow Control Gate Replacement and Dam Repairs Project
Post-Bid
Spencer, MA

Watershops Pond Dam Rehabilitation
Results
$577,810 est. value
Springfield, MA

Cady Brook Diversion Dam
Results
$610,483 est. value
Pittsfield, MA

Pine Tree Brook Reservoir Dam Decommissioning and Stream Restoration Project
Renovation, Infrastructure
Bidding
$75,000 est. value
Boston, MA

On-Call Tunnel Repairs Systemwide
New Construction
Post-Bid
Boston, MA

Lake Holbrook Dam Rehabillitation
Results
$900,000 est. value
Holbrook, MA 02343

Wachusett Dam Bastion Improvements
Renovation
Post-Bid
$4,033,260 est. value
Clinton, MA

Wachusett Reservoir North Dike and South Dike Instrumentation
Results
Less than $240,000 est. value
West Boylston, MA

Hydraulic Structures Maintenance and Repairs Annual Contract
Term Contract
Post-Bid
Holyoke, MA

Sawmill Pond Dam Rehabilitation
Results
Less than $360,000 est. value
Plymouth, MA

North Reservoir Dam Gatehouse and Dam Improvement Project
Renovation
Post-Bid
$4,800,000 est. value
Winchester, MA 01890

Last Updated 02/03/2022 11:01 AM
Project Title

Spring Pond Dam Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Saugus, MA   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes rehabilitation of an earthen embankment dam and outlet improvements, including: installation of a temporary cofferdam in Spring Pond to facilitate work on the upstream slope of the dam: installation of a temporary flow bypass system from Spring Pond to Griswold Pond: filling and grading to reshape the downstream and upstream earth embankment slopes of the dam: restoration of disturbed areas and appurtenant work.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents