Similar Projects
Opus Area Improvements Phase 3
New Construction, Infrastructure
Bidding
Minnetonka, MN

2022 Water Rehabilitation
Infrastructure
Bidding
$818,000 est. value
Brooklyn Center, MN

Ground Thawing Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

Ductile Iron Pipe
Term Contract
Post-Bid
Minneapolis, MN

Meter Station M228A, Interceptor 7015C, and L35 Repair
Renovation, Addition
Results
Brooklyn Park, Maple Grove, MN 55101

Water System Expansion Utility Improvements
Results
Carver, MN 55315

2022 Neighborhood Street Reconstruction
Infrastructure
Bidding
$2,677,000 est. value
Brooklyn Center, MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

City Street and Utility Improvements and CSAH Street Improvements
Results
$7,500,000 to $8,500,000 est. value
Clearbrook, MN

2022 Street and Utility Improvement Project
Infrastructure
Bidding
$2,030,000 est. value
Saint Anthony, MN

2021 Watermain Replacement
Post-Bid
$520,000 est. value
East Grand Forks, MN

Old Village Phase 5 And 6 Street, Drainage and Utility Improvements
Results
MN

2022 Water Meter Replacement
Infrastructure
Bidding
East Grand Forks, MN

West Bridge Street Reconstruction
Post-Bid
$3,400,000 est. value
Owatonna, MN

2021 Street and Utility Improvements
Results
Belle Plaine, MN

Last Updated 01/20/2022 02:48 PM
Project Title

Knowlton Creek Forcemain Rehabilitation Phase 1

Physical Address View project details and contacts
City, State (County) Duluth, MN 55802   (Saint Louis County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish two existing air release valve vaults and replace one air release valve vault. Work includes, but is not limited to, coordinating and obtaining permitted access to two sites, completing delegated engineering for the bypass and shoring systems, bypassing flow from the 54-inch Knowlton Creek Forcemain using a hot tap / line stop bypassing system, demolishing two existing air release valve vault and associated appurtenances, constructing a new air release valve vault and associated appurtenances, installing cathodic protection provisions at two locations and restoring the sites.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents